How to Lower Masonry Wall Costs - Expedite Your Jobs with Morgen Scaffolding
If you want to see a happy man, take a look at a contractor who finishes his jobs weeks ahead of estimated time. Contractors who use Morgen Scaffolding consistently cut weeks from the job time, with resultant savings in wall cost, equipment rental and general overhead.
HOW DOES MORGEN DO IT?
1. By keeping the masons constantly working at their most productive working level.
2. Scaffolding is erected to the full wall height, before the masons go to work. All men and material are elevated as the wall rises.
3. No lost time for the masons. They never have to be moved from one wall to another while scaffolding is being raised.
4. Pallets of materials can be placed directly behind the mason on the elevated material platform.
5. No height limits!
6. To further speed up the job, completely assembled towers up to 40' high can be moved from wall to wall by fork lifts or cranes.
You owe it to yourself and to your company to get the facts now. Morgen Scaffolding can pay for itself by helping your business compete effectively with bigger companies or stay ahead of smaller fast-moving ones on the way up.
Write for literature and complete details today.