Masonry Magazine January 1962 Page. 21

Masonry Magazine January 1962 Page. 21

Masonry Magazine January 1962 Page. 21


IN THE JOB

Stable, contractor reports banding of brick and block unnecessary even when mason stations 21' in air-at Birmingham Junior High School in suburban Detroit.


Skytrak

Continues to move more material FASTER SAFER MORE ECONOMICALLY.

First "hi-lift" on the "American Construction Scene," the West Skytraks was developed to be practical, versatile and safe.

Today, years after its introduction as a "key member" of the West System, advanced "Wes Skytraks" continue to move all types of materials faster, better, safer and more economically than any other similar rig in the business.

Even in the most conservative estimates, users report the "West Skytrak pays for itself in less than a year." On the opposite page you'll find just a few of the nationally-known contractors using West equipment. See your nearest equipment dealer or write direct for documented data covering the first and foremost hi-lift that coast to coast is proving it meets today's most rugged demands... alone, or as a key unit of the over-all West System.


WEST
BRICK BUGGY CORPORATION
4310 Mayfield Rood Cleveland 21, Ohio
Phone: Evergreen 1-9468

Ability of Skytrak proved on Twin Towers Apartments in Operating on busy thoroughfare without tieing up traffic, shown at base of lift "25 floors down."

Centerpoint front axle prevents dangerous tilting of lead to either side. Even under extreme conditions, horizontal position of fork demonstrates ability of Skytrak to pick up or deposit pallet load of material over rough or irregular terrain.

Come "rain, snow or MUD," the Skytrak "gets through" with the regularity of the U. S. Mail.

Its reach, of 20 ft. in bility and power, Skytrak ful all around jobsite lat University because of eration.

Even on two-story apartment in Cleveland, Skytrak saves time, money and material by direct service to floors where brick buggies complete the delivery of palletized material to mason stations inside structure with no hand handling.

Handling all types of materials is "all in a day's work" for Skytrak as illustrated by scaffold setting on addition to plant of Diebold, Inc.

Ground work to 20-6" scaffold service, Skytrak works economically in restricted areas such as on the Lincoln High School addition.


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next