Masonry Magazine January 1962 Page. 21
IN THE JOB
Stable, contractor reports banding of brick and block unnecessary even when mason stations 21' in air-at Birmingham Junior High School in suburban Detroit.
Skytrak
Continues to move more material FASTER SAFER MORE ECONOMICALLY.
First "hi-lift" on the "American Construction Scene," the West Skytraks was developed to be practical, versatile and safe.
Today, years after its introduction as a "key member" of the West System, advanced "Wes Skytraks" continue to move all types of materials faster, better, safer and more economically than any other similar rig in the business.
Even in the most conservative estimates, users report the "West Skytrak pays for itself in less than a year." On the opposite page you'll find just a few of the nationally-known contractors using West equipment. See your nearest equipment dealer or write direct for documented data covering the first and foremost hi-lift that coast to coast is proving it meets today's most rugged demands... alone, or as a key unit of the over-all West System.
WEST
BRICK BUGGY CORPORATION
4310 Mayfield Rood Cleveland 21, Ohio
Phone: Evergreen 1-9468
Ability of Skytrak proved on Twin Towers Apartments in Operating on busy thoroughfare without tieing up traffic, shown at base of lift "25 floors down."
Centerpoint front axle prevents dangerous tilting of lead to either side. Even under extreme conditions, horizontal position of fork demonstrates ability of Skytrak to pick up or deposit pallet load of material over rough or irregular terrain.
Come "rain, snow or MUD," the Skytrak "gets through" with the regularity of the U. S. Mail.
Its reach, of 20 ft. in bility and power, Skytrak ful all around jobsite lat University because of eration.
Even on two-story apartment in Cleveland, Skytrak saves time, money and material by direct service to floors where brick buggies complete the delivery of palletized material to mason stations inside structure with no hand handling.
Handling all types of materials is "all in a day's work" for Skytrak as illustrated by scaffold setting on addition to plant of Diebold, Inc.
Ground work to 20-6" scaffold service, Skytrak works economically in restricted areas such as on the Lincoln High School addition.