Masonry Magazine March 1966 Page. 4
HOW TO BEAT
THE MASON
SHORTAGE
INCREASES YOUR MASONS' PRODUCTION 20% ΤΟ 30%
Because Morgen Scaffolding rises steadily as the wall progresses, masons work at the right height, materials handy, and without interruption. Hundreds of contractors report time savings of one-fourth to one-third of time on conventional scaffolding.
EXTEND MASONRY SEASON UP TO 50 WEEKS LONG
With Morgen's factory-built winter enclosure system, masons can work year around. The enclosure is assembled on the ground and elevated as work progresses. No dangerous handling of planks, poly or heaters high in the wind.
MASONS PREFER TO WORK ON MORGEN SCAFFOLDING
You can choose the best masons because they all want to work without stooping and reaching. They turn out more production without working so hard.
Write for literature
MORGEN Manufacturing Co.
Box 160-AC YANKTON, S. D. 57078
MASONRY
March, 196