MORGEN

Here's How Morgen Scaffolding Slashes Masonry Costs

1 Keeps masons constantly working at their most productive level with all materials stocked at their fingertips on a convenient raised platform.

2 Makes packaged material handling more efficient because unbroken pallets can be placed right where the masons want them. All material is elevated with the mason until it is placed in the wall.

3 Scaffolding planks are handled only once for each wall by men working on the ground regardless of wall height.

4 Completely assembled towers can be moved from wall to wall by fork lift or crane.

Contractors often cut days sometimes weeks from estimated job time by switching to MORGEN Scaffolding. Frequently pays for itself on the first job! Better look into it now WRITE FOR LITERATURE AND JOB REPORTS.


MORGEN MANUFACTURING CO.
Box 160-AD Yankton, S. Dak. 57078