Independent Research Confirms

Morgen Scaffolding Increases

Masons' Production 20%

A Mason Productivity Study, conducted by the College of Engineering at the University of Texas at Austin, under contract H-1470 with the U.S. Department of Housing and Urban Development, makes the following statements:

"The important feature is to maintain a convenient level of work such that the mason experiences a minimum fatigue. Thus, Morgen Towers with the adjustable feature allow a higher rate of productivity than is possible with conventional tubular scaffolds." Vol. IV, 3.6.11.1.

"Recommendations: Use adjustable scaffolding properly located. Masons working on adjustable scaffolding increase productivity 20 percent over that obtained when working on 6-ft. fixed scaffolding." Vol. IV, 4.3.


Here's How Much You Can Save Per Year-
ANNUAL DOLLAR SAVINGS
on ten bricklayers production
based on 1400 hours per year (35 weeks x 40 hours)
(The national average employment for bricklayers is 35 weeks a year, according
to the International Masonry Institute, Washington, D.C.)

If you pay...
you can expect
to save...
SAVINGS WITH
Hourly Annual
Pay Scale (35 weeks)
10%
Increase
15%
Increase
20%
Increase
25%
Increase
25%
Increase
$ 7.00 $ 9,800
$ 9,800
$14,700 $19,600 $24,500
$29,400
$ 7.50
$10,500
$10,500
$15,750 $21,000 $26,250
$31,500
$ 8.50
$ 8.00 $11,200 $11,200 $16,800 $22,400 $28,000 $33,600
$11,900 $11,900 $17,850 $23,800 $29,750 $35,700
$ 9.00
$12,600 $12,600 $18,900 $25,200 $31,500 $37,800
$ 9.50 $13,300 $13,300 $19,950 $26.600 $33,250 $39,900
$10.00 $14,000 $14,000 $21,000 $28,000 $35,000 $42,000
$10.50 $14,700 $14,700 $22,050 $29,400 $36,750 $44,100
$11.00 $15,400 $15,400 $22,600 $30,800 $38,000 $46,200
$11.50 $16,100 $16,100 $24,150 $32,200 $40,250 $48,300
$12.00 $16,800 $16,800 $25,200 $33,600 $42,000 $50,400
$12.50 $17,500 $17,500 $26,250 $35,000 $43,750 $52,500
$13.00 $18,200 $18,200 $27,300 $36,200 $45,500 $54,600
$13.50 $18,900 $18,900 $28,350 $37,800 $47,250 $56,700
$14.00 $19,600 $19,600 $29,400 $39,200 $49,000 $58,800

In addition
MORGEN

Morgen Scaffolding saves on the cost of laborers. It eliminates rescaffolding, and simplifies set-up, moving and teardown. You can move assembled towers from wall to wall by fork-lift or crane. Some contractors say they need only half as many laborers, but others say they need more laborers to keep up with the masons increased production, particularly with block work.

For complete information, write today to
MORGEN MANUFACTURING CO Box 160-E1 Yankton, S.D. 57078


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next