MASONRY CONSTRUCTION COST ESTIMATE
TABLE OF CONTENTS
TABLE NO. TITLE OF TABLE DESCRIPTION OF TABLE CONTENTS
1. PROJECT DESCRIPTION INPUT DESCRIBES PROJECT LOCATION, SIZE MANAGEMENT, AND UNIT LABOR COSTS,
2. MASONRY MYTHE INPUT DATA DESCRIBES MATERIALS AND HETHODS FOR CONSTRUCTION OF EACH WYTHE,
3. MASONRY MYTHE SUMMARY PROVIDES MATERIALS QUANTITIES AND COST FOR EACH WYTHE
DATA MAY BE USEFUL FOR ESTIMATING CHANGE ORDER COSTS.
4. MASONRY HALL SUMMARY PROVIDES MATERIALS QUANTITIES, UNIT HALL COSTS, PROJECT HALL COSTS.
CONSTRUCTION TIME, AND CREW MIX FOR EACH MALL
5. MASONRY PROJECT SUMMARY PROVIDES PROJECT MATERIALS QUANTITIES, COSTS, CONSTRUCTION TIME, AND ECONOMIC DATA.



TABLE 1 PROJECT DESCRIPTION INPUT DATA
1. NAME OF OWNER GRIMM, CLAYFORD T
2. NAME OF ESTIMATOR DIKRAN B KONIALIAN
3. BUILDING TYPE NON BEARING HALLS ON CONCRETE FRAME
4. NUMBER OF STORIES(S) 10
5. BUILDING GHOSS FLOOR AREA, 30 FT(GFA) 222220,000
6. PROJECT LOCATION DALLAS, TEXAS
7. ESTIMATED HEGINNING DATE FOR HASONRY CONSTRUCTION JUNE 1. 1977
8. WEATHER FACTOR() .810
9. ANTICIPATED JOB DELAY TIME HONK DAYS(D) 5.ece
10. LOCAL ENH BUILDING COST INDEX AT CONSTH, START (1913-100)(1) 1376,000
11. AVERAGE BUILDING PERIMETER, FT(BP) 400.000
12. BUILDING PERIMETER WORKED ON AT ONE TEME/BUILDING PERIMETER (KE) .300
13,000
14. TOTAL LENGTH OF ALL MASONRY PARTITIONS IN BUILDING, FT(BP) 4002,000
15. PARTITION LENGTH WORKED UN AT ONE TIME/TOTAL PARTITION LENGTH(KP) 038
16. PARTITION LENGTH HORKED ON BY ONE HABON, FT(LP) 13.000
17. MASONRY CONTRACTOR OVERHEAD LABOR AND MATERIAL COST (HCO) .270
18. MASONRY CONTRACTOR PROFIT/MASONRY CUNTRACTOR COST (HCP) .100
19. GENERAL CONTRACTOR MARKUP/MASONRY CONTRACTOR PRICE (GCOP) .050
20. NORMAL MASON PRODUCTIVITY, UNETS/MASON(PN) 85,000
21. FORMAN HAGE RATE S/HR(RF) 14,540
22. MASON WAGE MATE, SHR (8) 10,040
23. HELPER PAGE HATE S/HR(RM) 6.015
24. HOIST MECHANIC HAGE RATE S/HR(RE) 9,558
24. TOTAL NUMBER OF WALLS TO BE ESTIMATED 2
25. TOTAL NUMBER OF HYTHES TO BE ESTIMATED 3



TABLE 2 MASONRY WYTHE INPUT DATA FOR TABLE 3 MASONRY WYTHE SUMMARY OUTPUT
WALL NO. 1 FOR WALL NO. 1


MASONRY DESCRIPTION
1. YTHE NO 1 2
2. WALL BOLIDITYEBOLIO, CAVITY OR GROUTENICAVITY CAVITY
3. BOND PATTERNELO OPTI05) COPHON
4. MODULAR MATERIALS AND DESIGNEYES NO NO
5. WORK OBSERVATION NORMAL CLOSE NONE) NORMAL
6. HALL CUNATURE STRAIGHT STRAIGHT
7. GROSS WALL SURFACE AREA BOTIGA) 4002000 4002000
8. WALL OPENING SURFACE AREA, SO FEAD) 14400,000 14400,000
9. SUM OF HALL OPENING HEIGHTS, PT(SHD) 2576,000 2576,020
11. MORTAR JOINT TYPEC OPTIONS) CONCAVE/Y FLUSH


MORTAR DESCRIPTION
12. HEAD AND BED JOINT THICKNESS, IN(27) .375 .375
13. BED JOINT TYPE AND UNIT SOLIDITY FULL-BOLID SHELL HOL
14. MONTAR TYPECH, SON OJANDERE OR HCS TYPE SPC TYPE 3 PC
15. PORTLAND CEMENT COST S/CU FTEBAGSECC) 2,424 2,424
16. MASONRY CEMENT COST, S/CU FTIBAG) (HCC) 2,054 2,054
19. LIME COST. B/EU FT (BAG) (CL) 4,050 4,050
17. BAND COST, SACU YDECS) 4,750 4,750
18. ADMIXTURE TYPE NOHE
19, монтан ADMIN QUANT UNITS/CU PT(PO) -0.000 -0.000
20. ADMIXTUNE COST, SUNIT(CP) 0.000 0.000


MASONRY UNITS
21. UNIT HFGR, THICKNESS IN. (UT) 3,625 3,675
22. UNIT HER HEIGHT ( 3,025 7,625
23, UNIT HFGR, LENGTH, IN, (UL) 52911 15,475
24. UNIT TYPE AND USE OR TEXTURE FS SHOOTH L CHU DU
25, MASONRY UNITS PACKAGEDYES-NOS YES YES
26. COST OF MASONRY UNITSU) 315,000 334,000


CONTRACTOR MANAGEMENT
27. CORNER POLES USEDEYES-N NO NO
28, SCAFFOLDING TYPE AND POSITION ADJ. FACE ADJ. BACK
(ADJUSTABLE OR PERED AT WALL FACE ON BACKY


WYTHE NO. 1 2
MATERIALS ORDER FOR EACH WYTHE
1. NUMBER OF навську UNITS, THOUSANDS 195 40
2. MASONRY CEMENT FOR PORTAR, BAS 310 149
3. PORTLAND CEPEAT PUR PORTAR, BAS 310 149
4. PORTLAND GEMENT FOR GROUT, B 310 149
5. TOTAL PORTLAND CEMENT, BAS 154 74
6. GROUT LIMES 154 74
7. TOTAL LIME, BAS 154 74
8. MORTAR BAND, CU YD 54 25
9. GROUT BAND, CU YD 54 25
11. TOTAL BAND, CU YD 54 25
12. UNITS OF ноктая криза


WYTHE MASONRY COST, B/SO FT
13. MASON CONTRACTOR COSTIER, AUX, MAT 2,111 1,137
14. AUXILIARY MATERIALS AND SERVICES CUSTISA) 27933 1496
1S, GENERAL CONTRACTOR COST 4,111 1,004
16. OWNER COSTICNT 145425 63656


TOTAL HITHE COST
17. MASONRY CONTRACTOR COSTIER,AUX,WAT 36433 36433
18. AUXILIARY MAT AND SERVICES CUSTISA) 27933 27933
19, MASONRY CONTRACTON SID 145425 145425
2, GEN, CONTR, MASONRY DONNEN COSTS 145425 63656


TIME LAPSE
21. HOUR WORK DAYS REQUIRED(CT) 25 14
22. ESTIMATED HABON PRODUCTIVITY 352 200


MASONRY/AUGUST, 1978 25


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next