BIA Technical Notes on Brick Construction

Brick Institute of America 1750 Old Meadow Road, McLean, Virginia 22102

GUIDE SPECIFICATIONS FOR BRICK MASONRY
III OF V
PART III EXECUTION
11в
REVISED
Feb.
1972


INTRODUCTION

This Technical Notes contains the guide specifications in CSI format for Part III Execution. Part 1 General, and Part II - Products are in Technical Notes 11A Revised.


PART III - EXECUTION


# 3.01 PREPARATION:



A. Wetting Brick:

Guide Specification

1: Wet brick with absorption rates in excess of 20 g./30 sq. in./min. (20 g./194 cm²/min.) determined by ASTM C 67, so that rate of absorption when laid does not exceed this amount.

2. Recommended procedure to insure that brick are nearly saturated, surface dry when laid is to play a hose on the pile of brick until the water runs from the pile. This should be done one day before brick are to be used. In extremely warm weather, play hose on pile several hours before brick are to be used.



B. Cleaning Reinforcement:

Before being placed, remove loose rust, ice and other coatings from reinforcement.


# 3.02 GENERAL ERECTION REQUIREMENTS:



A. Pattern Bond:

1. Lay exposed masonry in running bond.

2. Bond unexposed masonry units in a wythe by lapping at least 2 in. (51 mm).



B. Joining of Work:

1. Where fresh masonry joins partially set masonry:
a. Remove loose brick and mortar.
b. Clean and lightly wet exposed surface of set masonry.

2. Stop off horizontal run of masonry by racking back 1/2 length of unit in each course.

3. Toothing is not permitted except upon written acceptance of the Architect/Engineer.



C. Tooling and Tuck Pointing:

1. Tooling:
a. Tool exposed joints when "thumb-print" hard with a round jointer, slightly larger than width of joint.
b. Trowel-point or concave-tool exterior joints below grade.
c. Flush cut all joints not tooled.

2. Tuck pointing:
a. Rake mortar joints to a depth of not less than 1/2 in.


# Notes

3.01.A.1 Note requirements for cold weather, section 1.05.C.2.a, and section 1.03.B.3 for testing requirements.

3.02.A.1 Alter if other than running bond required.

3.02.C Alter to allow other joints to meet architectural requirements.

3.02.C.2 Delete if not required.


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next