disputes between the Laborers and the Operating Engineers over

disputes between the Laborers and the Operating Engineers over the operation of forklifts in connection with masonry work at various construction sites throughout the State of Wisconsin. The work was awarded to the Operating Engineers in all of the decisions, and it is therefore the contention of the Operating Engineers that this factor favors an award of the disputed work to employees whom it represents.

On previous occasions the Board has refused to accord significant weight to such awards when they fail to explicate the factors upon which they are based. In the instant case the awards consist of brief letters which rely on either the 1954 agreement between the two Internationals, discussed supra, or a 1907 decision apparently made by the American Federation of Labor. The letters do not set forth any other factors as a basis for the award. As indicated above, we do not attach any weight to the 1954 memorandum of understanding, and the record sheds little light on the 1907 decision by the American Federation of Labor. Moreover, we note that the Employer is not obligated to submit any dispute to the Impartial Jurisdictional Disputes Board, and the decisions submitted in evidence are not binding on the Employer. We therefore accord the decision no weight in determining the award of the disputed work.

7. Employer preference

The Employer originally assigned the disputed work to employees represented by the Laborers, and it has expressed its clear preference that the disputed work be awarded to those employees. Accordingly, we find that this factor favors an award to employees represented by the Laborers.

Conclusion

Upon the record as a whole, and after full consideration of all relevant factors involved, we conclude that employees who are represented by the Laborers are entitled to perform the work in dispute. We reach this conclusion relying on the factors of the collective-bargaining agreements, employer practice, and employer preference. In making this determination, we are awarding the work in question to employees who are represented by the Laborers, but not to the Union or its members. The present determination is limited to the particular controversy which gave rise to this proceeding.

DETERMINATION OF DISPUTE

Pursuant to Section 10(k) of the National Labor Relations Act, as amended, and upon the basis of the foregoing findings and the entire record in this proceeding, the National Labor Relations Board hereby makes the following determination of dispute:

1. Employees of McWad, Inc., who are represented by Laborers International Union of North America Local 1359 are entitled to perform the work of operating forklifts and skid loaders used in connection with McWad, Inc.'s masonry work at the construction site of the Employer's Insurance of Wausau Training Center in Wausau, Wisconsin.

2. International Union of Operating Engineers, Local No. 139, is not entitled by means proscribed by Section 8(b)(4)(D) of the Act to force or require McWad, Inc., to assign the disputed work to employees represented by that labor organization.

3. Within 10 days from the date of this Decision and Determination of Dispute, International Union of Operating Engineers, Local No. 139, shall notify the Regional Director for Region 30, in writing, whether or not it will refrain from forcing or requiring the Employer, by means proscribed by Section 8(b)(4)(D) of the Act, to assign the disputed work in a manner inconsistent with the above determination.

Dated. Washington, D.C. July 27, 1982

Howard Jenkins, Jr.,
Member

Don A. Zimmerman,
Member

Robert P. Hunter.
Member

NATIONAL LABOR RELATIONS BOARD
SEAL



ANCHOR "Hy-Dump"
Low Charge 38"- High Discharge 35" 12 cu. ft. capacity
Power Dump

Dealer
Inquiries
Invited

Anchor

Designed especially to provide a low charging height and a high discharge height coupled with a power dump. A fast mixing machine capable of dumping into wheelbarrow, concrete buggy or mortar pump.

For information, phone (312) 247-2530 or write
ANCHOR MANUFACTURING CO.
2922 W. 26th St.. Chicago, III. 60623



ORIGINATORS OF
Pre-Fabricated Glass Block Panels

CUSTOM MADE TO YOUR REQUIREMENTS
NATIONAL DISTRIBUTOR
PITTSBURGH CORNING
SCHALKE GLASS BLOCK-GERRIX HOLLOW
GLASS BLOCK

MANY STYLES AND SHAPES

SASH REPLACEMENT

SPECIALISTS IN THE INSTALLATION OF
GLASS BLOCK

FRED BEYER
Since 1910
7810 S. Claremont Chicago, III. 60620
(312) PR 8-4300


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next