Masonry Magazine June 1983 Page. 15
THE WORKHORSE makes good ole Horse Sense!
The bare fact is, elevating scaffolding gets you 20% to 30% more production. The Workhorse is designed to be used on 8' to 15'4" walls. This is probably where 80% to 90% of your dollar volume exists, but it's too much trouble to use heavy-duty elevating scaffolding. So you use those costly frames.
When you figure your job, it's probably something like this:
Materials $30,000
Labor 50,000
$80,000
10% Overhead $ 8,000
10% Profit 8,000
Bid Price $96,000
Do your job with The Workhorse and it comes out like this:
Materials $30,000
Labor 42,000-16% Decrease
$72,000
10% Overhead 7,200-10% Decrease
23.33% Profit 16,800 110% Increase
Bid Price $96,000
Base tower and elevating bracket weigh only 50 lbs., so, you can move them from wall to wall by hand. 35 ft. of The Workhorse costs about as much as a good mortar mixer, and it'll pay for itself on your job during one monthly estimate. You can DOUBLE your profits with The Workhorse.
Call or Write for Free Information
NON-STOP SCAFFOLDING 4715 Overton Shreveport, LA 71106 318-861-2694