Masonry Magazine August 1986 Page. 43

Masonry Magazine August 1986 Page. 43

Masonry Magazine August 1986 Page. 43
Mason Contractor: Bill Dentinger Inc.

Non-Stop Scaffolding is going places!

Non-Stop Scaffolding is being used by top Mason Contractors all over the country. They know if they get 25% more production they put 100% more profit in their pockets. They Know:

Running a wall Non-Stop from start to finish saves dollars.

Pre-stocking on the laborer's platform makes their forklift more versatile and their job runs more smoothly.

(This feature not available on other elevating scaffolding.)

With Non-Stop's rigidity the need for expensive tie-ins is reduced.

Not removing X-braces rising and descending saves money and keeps their laborers with their mason (where they should be!) 100% of the time.

(This feature not available on other scaffolding.)

Being able to move 45' high scaffold towers with a scaffold mover attachment saves time and money.

MEMBER
SCAFFOLD
ASSOCATION
SIA

Call or Write for Free Information
NON-STOP SCAFFOLDING
4715 Overton Shreveport, LA 71106 318-861-2694