NLRB DECISION
continued
an award of the disputed work to employees represented by the Laborers."

Conclusions
After considering all the relevant factors, we conclude that employees represented by the Laborers are entitled to perform the work in dispute. We reach this conclusion relying on the factors of the collective-bargaining agreements, employer preference and past practice, area practice, relative skills, economy and efficiency of operations, and prior Board decisions. In making this determination, we are awarding the work to employees represented by the Laborers, not to that Union or its members.

Scope of the Award
The Employer contends that, because the Operating Engineers has persisted in attempts to influence the assignment of mason-tending forklift work, the Board should issue a broad award to employees represented by the Laborers on jobsites throughout the State of Wisconsin or alternatively to jobs involving mason-tending forklift work where the Employer is the masonry subcontractor on construction projects in the State of Wisconsin. The Laborers contends that the Board should grant the Employer's request for a broad order in view of the longstanding history of this dispute and the evidence that the dispute will recur. Contrary to the Employer's and the Laborers' contentions, we conclude that a broad order is not warranted.

The Operating Engineers filed a grievance concerning the disputed work. The Operating Engineers did not engage in threats of picketing or picketing, rather, it was the Laborers that threatened to picket and did picket to protest the reassignment of the disputed work to employees represented by the Operating Engineers.

In these circumstances, we decline to issue the broad award, and we limit the present determination to the particular controversy which gave rise to this proceeding.

DETERMINATION OF DISPUTE
The National Labor Relations Board makes the following Determination of Dispute.
Employees of Krall's Masonry, Inc. represented by Laborers' International Union of North America, Local 1359 are entitled to perform the work of operating forklifts used in connection with Krall's Masonry, Inc.'s masonry work at the Marathon County Health Care Center, Wausau, Wisconsin jobsite.

Dated. Washington, D.C. 30 September 1986

Wilford W. Johansen,
Marshall B. Babson.
James M. Stephens,
(SEAL) NATIONAL LABOR RELATIONS BOARD
Member
Member
Member

Following a campaign speech, a young man rushed up to Senator Everett Dirksen and said, "Senator, I wouldn't vote for you if you were St. Peter!"
Dirksen eyed the young man for a moment, then said: "Son, if I were St. Peter, you couldn't vote for me, because you wouldn't be in my district."

Architects
Engineers
Masonry Contractors
Masons
Choose Ready Mixed Mortars with storage. Two-day workability allows masonry work to proceed without interruption. Savings range from 10 to 20% in material costs, while production can increase by 10 to 30%.
People who work with mortar know what they want and need...consistency, strength, reliability, economy, convenience, productivity. And they get it all in Ready Mixed Mortars prepared with ADDIMENT admixtures.
ADDIMENT brings modern technology to masonry construction with quality-controlled manufacturing, flexible delivery, easy handling and ADDIMENT Incorporated Admixtures.
So put an end to messy, costly job-site mixing, waste and all the other variations. Choose Ready Mixed Mortars with ADDIMENT admixtures. For information, write or call Bowinno Drive Doraville GA 30340 (404) 446-6250
ADDIMENT also produces a full line of advanced masonry and concrete block admixtures including the New Integral Concrete Block Waterproofer DMM2
38 MASONRY-MARCH/APRIL, 1987


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next