Masonry Magazine February 1989 Page. 50

Masonry Magazine February 1989 Page. 50

Masonry Magazine February 1989 Page. 50
Settle for the best... Non-Stop Scaffolding™

Now with the finest guarantee in the scaffolding industry: if you EVER bend or warp a Non-Stop™ tower in day-to-day use, we replace it FREE!

ONLY NON-STOP gives you ALL these money saving features:

•SET IT UP ONLY ONCE. Assembly is fast and easy and takes LESS time than frames. The only tool you need is a crescent wrench. Once set up, scaffold building labor is cut as much as 80% because you move it from wall to wall with your forklift.

•MOVE IT IN AND STOCK IT BEFORE YOU LAY THE FIRST PIECE OF MATERIAL. You save the expense of running scaffold-high. As the wall is built, the scaffolding will keep your bricklayers at their ideal working height and you'll get 20% to 35% more production over frames.

•PLACE FULL PALLETS OF BLOCK OR BRICK ON THE LABORERS' PLATFORM. The extensions bolt together to form one rigid tower. When you place a cube of blocks on the laborers' platform at 20' high, the backward flex will be less than one inch. That's before the scaffold is tied in. You can safely stock ahead and free your tractor for other duties. Our heavy-duty geared winch will safely raise the scaffold when it's fully loaded. Our winch carries a five year replacement guarantee.

•X-BRACES STAY IN PLACE AS THE PLATFORM IS RAISED AND LOWERED. This saves a tremendous amount of time for the laborers. Since they are not building scaffolds all day, they have little else to do but feed your bricklayers materials and raise the scaffold.

•THE NON-STOP SYSTEM IS ECONOMICAL. Our customers report that their scaffolding pays for itself in ten to twenty weeks and then returns that investment back to them every ten to twenty weeks.

•A FLEXIBLE FINANCING PLAN. Labor savings are typically four to five times your monthly payment (over 24 months). This will give you a positive cash flow from the start.

•IT IS UNBEATABLE ON UNEVEN TERRAIN. Non-Stop is worked in independent pairs of towers. Just stair-step your pairs down the hill and winch the platform level.

•ELIMINATE SAFETY HAZARDS. When you raise or lower the scaffold, your walkboards and guardrails go with you. Your men will be fully protected and your laborers won't throw your boards down to the ground every day.

•NON-STOP IS BUILT TO LAST. When we expanded, we bought a production machine shop to merge with our existing operations. We now make almost every part that goes into your scaffolding. It's built to withstand years of abuse.

•YOUR MEN WILL LOVE IT. We designed out the sway you find in other tower scaffolding. It is absolutely the best quality scaffolding you can buy.

For additional free information call or write:
Non-Stop Scaffolding • 1314 Hoadley Street • Shreveport, LA 71104
(318) 222-0702


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next