Masonry Magazine February 1992 Page. 25
THE GREAT WALL
IT TOOK 30 CENTURIES TO BUILD THE GREAT WALL.
WE FIGURE WITH MIGHTY SCAFFOLDING IT SHOULD HAVE TAKEN HALF THAT TIME.
Keeps masons working at waist all day! 20-35% increase in production.
Will climb-up with full pallets of block or brick on laborers' platform. Strong winch.
Erect only once and then move with your forklift or crane. Labor saving.
INTERSTATE WALL IN RALEIGH, NC BUILT BY ARROWHEAD MASONRY
X-Braces stays in place as platform is raised and lowered. Safety and Labor Saving.
Eliminates need to replank next levels because platform moves up with masons. Labor saving.
7' high extensions for easier erection. 1 man instead of 2. Labor saving.
FOR HIGH SPEED PROFITS CALL OR WRITE FOR YOUR FREE VIDEO
MIGHTY EQUIPMENT COMPANY
491 Allied Drive
Nashville, TN 37211
1-800-833-2120
See us at Booth 1005
It Just Works Better.
MASONRY EXPO ORLANDO, FLORIDA