Masonry Magazine June 1996 Page. 17

Masonry Magazine June 1996 Page. 17

Masonry Magazine June 1996 Page. 17
ASC Demands Explanation of AGC Withdraw of Support for the Standard Form Contract

The Chairman of the Associated Specialty Contractor and the Presidents of the ASC's eight constituent associations are demanding an explanation for the Associated General Contractors of America's (AGC) withdrawal of support from the Standard Form Construction Subcontract.

In a letter signed by the ASC sponsoring associations to AGC President Lee Wray Russell, ASC expressed concern over reports that AGC has chosen to retreat from agreed upon privileges of the subcontract. Instead, AGC has chosen to develop an alternative subcontract which contains payment provisions previously rejected by ASC and the American Subcontractors Association. This now casts a shadow on the relationships between the ASC and AGC.

"As one of the sponsoring associations of ASC, we met with the trustees of the other ASC organizations to discuss our concern over AGC's withdraw of the "payment upon performance" provision of the new AGC 640 form," said Donald Grant, President of the Mason Contractors Association of America.

"Obviously, AGC's general contractor members were more interested in pay if paid provisions. We are now in the unfortunate position of having to examine whether AGC is fully prepared to work with ASC in good faith on issues that affect our industry," said Grant.

The Standard Form Construction Subcontract was published in 1994 after more than two years of a joint effort between members of the AGC, ASC and ASA. The contract was designed to promote more efficient, timely and economical construction and insure equitable and ethical relations between general contractors and subcontractors. It was also an accepted tool for moving beyond a source of historic disagreement until the rumored withdrawal of support by AGC.



VIDEO DEMO AVAILABLE

"TUT"
Masonry Accounting & Estimating Software Used by Industry Leaders Since 1979

TUT SOFTWARE INCLUDES:
Payroll
Parables
Job Cost
Receivables
Gen Ledger
Estimating

J. Meidl Systems, Inc.
J. MEIDL SYSTEMS PROVIDE:
Certified Payroll Reports
Weekly Production Tracking
No Month-End Processing
Job Costs setup from Estimating
Saves Time, Money, & Work
Easy to Learn & Operate

1-800-875-6885
MASONRY-MAY/JUNE, 1996 17


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next