Masonry Magazine April 1997 Page. 3
MASONRY
THE MAGAZINE FOR THE MASONRY INDUSTRY SINCE 1961
Volume 36 Number 2
March/April 1997
Articles
The Changing Environment of Masonry Building Codes 8
In the year 2000, a new building code will be in place throughout the United States. This new single code will replace the three existing building codes currently governing all construction.
Phoenix, Second Time Around. 12
Assuring the Quality of Mortar... 19
To provide quality masonry, contractors must provide quality mortar. To insure that we provide these standards on each and every project, a system must be established to meet quality requirements.
Elevating Scaffolding... Why More Contractors are Elevating Their Profits 23
In today's construction climate, pricing is very competitive. So to add to the contractors project bottom line, increases in production is the only answer. Contractors are finding that elevating scaffold is the way to go.
Listening... The Forgotten Management Skill...... 31
OSHA Still Needs Reform 33
Next Issue
MASONRY
Also in Next Issue
EIFS Systems
Job Interviewing
Material Handling
Rough Terrain
Forklifts
Romancing the Stone
Business
Planning
How Stone is Processed for Construction
DEPARTMENTS
From the President 7
Product Update ...44
Classified 50
Ad Index 50
MASONRY (188N 0025-4681) is published six times annually (January/February, March/Apeil, May/June, July/August, September/October, November/December). Subscription rate 530 per year, Canada 524 (US, currency). Single copies $3.50. Copyright 1997 by Mason Contractors Association of America. POSTMASTER: Send address changes to MASONRY, 1550 Spring Road, Ouk Brook, Illinois 60521. Second class postage paid in Ouk Brook, Illinois 60521, and additional mailing offices, SEND SUBSCRIPTIONS, advertising, editorial and business correspondence tec MASONRY, 1550 Spring Road, Ouk Brook, IL 60521. Phone 630/782-6767. Fax: 630/782-6786
MASONRY-MARCH/APRIL, 1997 3