Masonry Magazine February 2000 Page. 47

Masonry Magazine February 2000 Page. 47

Masonry Magazine February 2000 Page. 47
FASTER & EASIER

to set up, work on, take down & move

MORGEN'S NEW CABLE-LESS TOWER™ SCAFFOLDING

We'll put money in your pocket with these design breakthroughs:

* No more cables to jump.
* One-third fewer towers required with a 17-foot long bridge between pairs.
* Less towers to purchase & move - covers 67% more wall than scaffolds on 7-foot centers.
* Large, open 17-foot long, braceless working area for faster material stocking.
* Optional power raising of a fully-loaded platform with a 3/4" drill.
* Level platform using standard 8' & 16' planks.

MORGEN THE AUTHORITY IN ADJUSTABLE SCAFFOLDING

800-952-4726 605-665-9654 605-665-7017 Fax

MORGEN MANUFACTURING CO.

P.O. Box 160 Yankton, SD 57078-0160 U.S.A