Masonry Magazine August 2000 Page. 3
After 3 weeks, we have concluded that we should have bought the scaffolding a long time ago.
The labor we have saved is unreal and at the rate that we are moving with it; the scaffolding should pay for itself much sooner than we projected.
Stephen F. Peters, Sr.
Stephen F. Peters, Inc.
After only a few days it was clear the scaffold would be of tremendous value to us.
From profitability, versatility, reduced wear and tear on the forklifts, savings in labor cost, to the ability for us to provide a safer and less physical demanding working platform.
Matthew J. Stofko
Stofko Masonry, Inc.
We have seen the productivity increase greatly, and by far it is the safest scaffold we have ever seen or used.
Room to work, adaptability to other types of scaffold, ease to set up, move, tear down and send to the next job are only a few good points out of many.
Denis Knowlton
Knowlton Construction
Our laborers quickly learned how to set-up and operate the Hydro Mobile scaffolding, and they enjoy the huge working environement (Sidewalks in the Sky) they now have.
The Hydro Mobile scaffolding is simply the greatest piece of equipment we have ever purchased.
John Gaetano
Gaetano Contractors, Inc.
HYDRO MOBILE SCAFFOLDING
The Leader's Choice
Sidewalks Hydro Mobile in the Sky
Avant-Garde Engineering
1.888.484.9376