Masonry Magazine September 2002 Page. 2
THE NEW
M2 READY 2 BUILD
FOR 3 REASONS
EFFICIENCY
Visible hooks w/automatic lifting mechanism
Open deck design to pass wall ties
Incorporated bridge coupling system
Integrated access tower
SIMPLICITY
Safe and effortless sliding door system
Built-in guard rails & doors storage
Powerful low-maintenance dual pump power
CAPACITY
16" x 16" climbable tower w/Quick connect bolts-No X-brace and no lean
Independent or linked modular base
Fast set-up on any terrain
Telescopic base outriggers - 35' free standing
Braceless platform
20,000 LB POINT LOAD CAPACITY
Passes wall ties
Built-in storage
Climbable tower
Compatible with previous M-series
INNOVATION THAT YOU CAN TRUST
To receive our product brochure, call us now: 1.888.484.9376
or visit our web site to locate your nearest distributor: HYDRO-MOBILE.COM
HYDRO MOBILE
Rising with you