Masonry Magazine October 2002 Page. 39

Masonry Magazine October 2002 Page. 39

Masonry Magazine October 2002 Page. 39
TIME IS MONEY

CUT CLEANING TIME BY HALF OR MORE
ON YOUR MASONRY JOBS

AVERAGE SQUARE FEET OF NEW BRICK CLEANED
BY ONE MAN IS USUALLY 2000-3000 PER DAY
WITH CONSISTANT RESULTS

DON'T LET A BAD CLEANING JOB REFLECT ON
YOUR SUPERIOR MASONRY WORK

Distributor
Inquiries
Invited

For further information or to arrange a
demonstration, call or write today.

UNIQUE INDUSTRIES, INC.
KEM-O-KLEEN DIVISION
FOR EXCELLENCE UNDER PRESSURE
10600 W. 50th Ave., Bldg 13. Wheat Ridge, CO 80033
Phone 800-274-4121
www.kem-o-kleen.com
GROUT PUMPS

Ideal for grouting metal door frames in place. Both hand operated & air powered models are available. Output up to 11 gallons/minute. Capable of 10 foot vertical lift. 1.9 or 4.6 gallon hopper size. Empty weight is 19 to 32 pounds.

KENRICH KNRICH
PRODUCTS, INC.
6853 #B N.E. 42nd Ave. Portland, OR 97218
Phone (503) 281-6190 Fax (503) 281-6227
KR
PRODUCTS www.kenrichproducts.com
Eliminate Pallets

Fully automatic vertical and horizontal strapping systems using plastic or steel strapping. Designed specifically for the Masonry industry.

OR-T 241-C4F Vertical Strapping Machine

Orgapack
Endra
Strapex

strapex USA
2601 Westinghouse Blvd.
Charlotte NC 28273
Phone: 1-800-826-7913 Fax: 1-704-588-8795
sales@strapexusa.com

The Voice of the Mason Contractor
October 2002
Masonry 37