Masonry Magazine July 2003 Page. 4
contents MASONRY
MASONRY
Volume 42, Number 7
July 2003
AIR
Barriers
MCAA member Hollenback & Nelson, Inc., provided an award-winning addition to the Cretin-Derham Hall High School in St. Paul, Minn, by adding new construction that blended with the existing entry tower.
10
features
14
Air Barriers Systems -
Opportunities and Challenges
Interest in air barrier technology for building envelopes is growing, through design and building code changes. Mason contractors need to be prepared or risk being left behind.
20
Adjustable Scaffolding Safety Benefits
With the work environment under constant monitoring by OSHA and state safety agencies, it's critical to make sure you are using the right equipment in the right way. We'll examine adjustable scaffolding in use and how it can create a safer job site.
26
Tuckpointing Tool Basics
Tuckpointing requires removal of material before adding material. We'll look at some of the grinders and techniques for doing just that.
34
Stick 'em up!
The "who, what, when, where and why" of adhesives for the masonry industry.
14
26
20
columns & departments
4
36
From the Editor
Product Showcase
6
38
President's Message
Legal Advice
8
40
Government Affairs
Finance Management
10
42
34
Making the Grade
Marketing 101
12
44
http:
New Products
Classified Advertising
45
News
40
42
Layout & Design Lionheart Publishing, Inc.
2
Masonry
July 2003
MASONRY (ISSN 0025-4681) is publishedmety Subscription rate $24 per year: Canada $30 (US. cumency) Single copies $3.50. Copyright 2003 by Mason Contractors Association of America, POSTMASTER: Send address changes to MASONRY, 33 South Roselle Rd. Schaumburg, IL 60193, and additional malling offices. Canadian return address Station A P.D. Box 54 Windsor, Ontario NDA 615. SEND SUBSCRIPTIONS and business comespondence to MASONRY 33 South Roselle Rd., Schaumburg, IL 60193. Phone: 847/301-0000 or 800/536-2225. Fax: 847/301-1110.
www.masoncontractors.com