Masonry Magazine January 2008 Page. 63
Citation Awards:
POWER
AND
FLEXIBILITY
Spangler Residence
Architectural Firm - Knoell & Quidort Architects
Structural Engineering Firm - KPFF Consulting Engineers
General Contractor-DeTar Construction Inc.
Masonry Supplier - Yavapai Block Co.
Masonry Contractor-Millenium Masonry
The Kauffeld Residence
Architectural Firm - Cadstar Design
Structural Engineering Firm Schneider & Associates Structural Engineers
General Contractor-Living Spaces LLC
Masonry Supplier-Young Block Co
Masonry Contractor The Runde Co. LLC
One Canyon Clubhouse
Architectural Firm-MAI Design Group
Structural Engineering Firm-PK Leffler Consulting Structural Engineering
General Contractor-Wespac Construction Inc.
Masonry Suppliers Block-Lite Co.; Telluride Stone Co.
Masonry Contractors-Maverick Masonry: Palo Cristi Stone Co.
FOR
HEAVY-DUTY
& SPECIALIZED
WORKS
Con project
Verre sur Vert
Nur's Island Quebec
Its lifting hook mechanism calls for minimum maintenance and gives the FRSM-20K all the power required. Assembled with one mast this system offers a maximum length of 48 (14.6m) a load capacity of 10 000 lb (4540 kg) a lifting speed of 721x per minute.
2CK
MAST CLIMBING NORC
PLATFORMS
Designed to satisfy the needs of masonry contracting companies, the FRSM-20K work platform combines safety, sturdiness and capacity for mid- to large-size job sites. Used with one or two masts, this system of cantilevers, bridges and forward extension allows users to benefit from over 130 different configurations. Ideal for construction projects up to 80 ft (25 m) in height, the FRSM-20K also distinguishes itself when comfort, safety and performance in high altitude are required.
96
FRACO
www.fraco.com
450.658.0094
1.888.372.2648
CIRCLE 101 ON READER SERVICE CARD
January 2008
Masonry 59
www.masonrymagazine.com