Masonry Magazine October 2011 Page. 30

Masonry Magazine October 2011 Page. 30

Masonry Magazine October 2011 Page. 30
CASE STUDY
HARDSCAPING
By Karl Bremer

Seating Repair at University of Wisconsin-River Falls

The popular outdoor amphitheatre on the campus of the University of Wisconsin-River Falls (UWRF) got a new lease on life last year, when crumbling limestone seating tiers were replaced with Versa-Lok seat walls and integrated stairs.

Nothing beats sitting outside on a beautiful summer's eve listening to music or enjoying a play. That's what Dr. Melvin Wall envisioned for the campus of UWRF in the 1960s, after he and his wife toured Northern Italy and fell in love with an amphitheatre built in the Greco-Roman style. Wall, chairman of the university's Plant and Earth Science Department and head of the Campus Planning Committee, took the idea to the administration and garnered the support of the president.

Wall proposed that an outdoor amphitheatre be built on the south end of the campus near South Fork, or "Pete's Creek." He enlisted the help of students, the administration and alumni, and a former student ponied up a $20,000 matching grant. Hundreds of students, faculty and friends of the university worked in mud to level the area and haul in large limestone blocks to create the seating tiers.

The Minnesota Orchestra performed at the dedication ceremony of the Melvin Wall Amphitheatre in 1972. Since, it has become a favorite gathering spot for UWRF students and area residents alike, hosting everything from commencement ceremonies to a popular weekly summer music series.

But the elements took their toll on the amphitheatre, according to Joe Mcintosh, UWRF grounds supervisor.

"Over time, the limestone had kind of deteriorated, so we put in a proposal to have it redone," Mcintosh explains. "We looked at a couple of different types of natural stone and also the Versa-Lok product. The natural stone was out of our budget range, so we went with the Versa-Lok."

The project began in Spring 2009 and was completed later that summer. The removal of the limestone blocks and installation of the new seat walls presented some challenges. Two massive oak trees shade the center of the facility and had to be preserved.

"We took some protective measures and tried to keep the contractors away from them as much as we could," says Mclntosh. "Then we gave them some product to enhance their root system. So far, they look pretty good."

Before.

28 MASONRY
October 2011 www.masoncontractors.org
During
The Voice of the Masonry Industry


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next