Masonry Magazine December 2017 Page. 76
''NO PROJECT IS WITHOUT ITS CHALLENGES, WHICH IS WHY MASONRY CONSTRUCTION IS ALWAYS STIMULATING.,,
-Josh Cronholm, Vice President of Ammex Masonry
major problems. Ammex Masonry had to also face the challenge of the own�er's expectation of thin brick versus full-depth brick. With the climate conditions of Colorado, thin brick may not last as long or be as effec�tive than other materials. "No project is without its challenges, which is why masonry construction is always stimulating," Cronholm states.
The Landmark Lofts Phase II project renamed 9 Seventy, was complet�ed in December of 2015, offering apartments ranging in size of studio to three bedrooms. Each apartment is decked out with hardwood-style floors, stainless steel appliances, modern fixtures, and in some apartments a balcony. Other amenities include a resort-style pool, a street�level coffee shop, a club�house and tons more.
9 Seventy's outdoor space is open and invit�ing, encourage residents to enjoy the outdoor lifestyle of Colorado. This includes a barbe�cue area adjacent to the pool, open spaces large enough for small to large gatherings, as well as bleacher-style seat�ing steps with overhead lighting for people to hang out at any time.