New User's Guide to ASTM Specification C94/C94M on Ready-Mixed Concrete

Words: Dan Kamys

New User’s Guide to ASTM Specification C94/C94M on Ready-Mixed Concrete


An updated edition of Manual 49, User’s Guide to ASTM Specification C94/C94M on Ready-Mixed Concrete, 2nd Edition, is now available in print and online.

Co-published by ASTM International and the National Ready-Mixed Concrete Association, this new edition represents a significant re-write of all portions of the book. It includes 22 comprehensive chapters that explain every aspect of ASTM C94, the "reference standard" for the industry.

ASTM C94 covers the complex subject of ordering, production and delivery of ready-mixed concrete. There have been many changes and improvements to C94 since the first edition of this manual was printed, especially in the technology for production and delivery of concrete. Manual 49 provides tips and advice and has numerical examples, photos and figures to illustrate proper procedures and implications when C94 is cited in project specifications.

Manual 49, User’s Guide to ASTM Specification C94/C94M on Ready-Mixed Concrete, 2nd Edition,is available for $89 USD in print (978-0-8031-7054-4; Stock # MNL49-2ND) or as an e-book (ISBN: 978-0-8031-7055-1; Stock #: MNL49-2ND-EB).

To purchase ASTM publications, search by stock number on www.astm.org, or contact ASTM Customer Relations, 877-909-ASTM; sales@astm.org).


Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together