Strengthening the Masonry Workforce Through Post-tensioning

Words: Dominic Darco
/Public/News/312005833-1.gif" width="248" height="174" border="1">
Photos courtesy of Cercorp Initiatives
One of the most overlooked factors when discussing the shrinking workforce is its relationship to current building technology. For any industry to be successful and remain commercially viable, there has to be a complementary relationship between the technology used and the state of the workforce. Put another way, we need both an efficient method for building masonry structures and, at the same time, a sufficient labor pool to build those structures. Without an adequate balance between these two factors, the industry will be unable to meet market demand, and profitability will decline. Though this may seem rather obvious to those within the industry, the relationship between technology and workforce can provide insights into both the current problem and a realistic solution.

Like two variables in a simple equation, technology and the workforce each directly affect the total solution that, in this case, is the state of the industry and its ability to meet market demand. By changing one of these variables in relation to the other, the industry is impacted in either a positive or negative way. As a result, there are only two possible ways to positively impact the industry: 1) increase the number of skilled workers in the labor pool; or 2) reconfigure the technology to accommodate the changing labor pool. Of course, in both cases, it is essential to bear in mind that any change must serve the masonry industry. In other words, neither factor can be radically changed so as to create an entirely new industry as in the case of pre-cast and cast-in-place tilt-up construction.

Over the last decade or so, the industry has largely focused on workforce development as a means to maintain its market share. Although little attention has been paid to developing new masonry technologies, one such innovation offering great promise has emerged.

The FlexLock? Solution

/Public/News/312005833-3.gif" width="173" height="175" border="1">
The FlexLock Wall System
The FlexLock Wall System is a multi-patented, post-tensioned masonry wall system developed to configure itself to the changing labor pool. Cercorp Initiatives Inc. specifically designed FlexLock so that mason contractors could use fewer journeymen bricklayers and more apprentices. This enables mason contractors to multiply their existing crews by breaking them down into smaller crews, each capable of doing the work of the previous larger crew. Beyond increasing productivity, smaller crews mean smaller labor costs. This, along with faster build times, translates into greater profitability.

FlexLock construction begins by installing anchors into the footing. Because footings vary, the first course is laid in mortar. This is the only time mortar is used. With the first course in place, all-thread tendon segments are connected to the anchors by means of a coupling. These are typically spaced about 4' on center. The interlocking units are then dry-stacked. A slot in the unit enables the mason to place the block around the tendon without having to lift it over the top. Grout is not used in the vertical cores.

This method of post-tensioning is unique to FlexLock. The units are precision ground on the top and bottom to 0.015" preventing point loading, making post-tensioning possible. The system accommodates non-modular construction, jambs, sills, lintels, pilasters, and can be matted to conventional masonry. At the top of the wall, a bond beam is laid, reinforced and grouted with post-tensioning accomplished within, or on top of, the bond unit. Cercorp has extensively tested the FlexLock System and found it to have three to four times the reserve strength of standard masonry.

A Case Study
/Public/News/312005833-4.gif" width="248" height="174" border="1" align="right" hspace="10" vspace="1"> To assess both the speed of construction and the composite workforce, Cercorp, working with the engineering firm of Ryan-Biggs Associates and the International Masonry Institute (IMI), built a small test structure. The building, along with some test panels, were constructed with IMI students at their apprentice training facility in Cascade, Md. The instructors began by laying out the first course, after which the students built up the leads and courses. The students were each timed by Cercorp at laying approximately 100-125 units per hour, with material handling being the primary limiting factor. As the walls were laid up, the instructor walked around with a level and dead blow hammer ensuring that the walls were plumb, and window and door opening were in the right place. From this test, Cercorp concludes that FlexLock can dramatically increase productivity.

For the masonry industry to expand its markets, it has to balance the equation between the workforce and technology. The FlexLock Wall System, with its unique post-tensioning technology, enables mason contractors to reconfigure the available labor pool to increase both productivity and profitability.

For more information and availability, visit Cercorp's web site at www.cercorp.com.

Choosing the Best Masonry Brush for the Job
April 2026

In masonry work, whether you are laying brick or block, installing stone veneer, or repairing mortar joints, cleaning up is a big part of the job. It’s easy to focus on the major tools like brick trowels, mixers, and mortar boards, but brushes are just as

Westminster Abbey Roof Repairs Race To Protect The Masonry Below
April 2026

Westminster Abbey is undergoing long-awaited repairs to its roof, and experts involved in the work say they have discovered hidden secrets along the way. For the masonry industry, the story is less about what's up top and more about what sits beneath it.

Building Stonework That Lasts Beyond the Surface
April 2026

How Today’s Systems Strengthen Traditional Masonry In masonry, longevity has always been the true measure of craftsmanship. Any wall can look impressive the day it’s finished, but the real test comes years later, after the first freeze-thaw cycle, after t

Mastering The Art Of Masonry Repair: The Dos and Don’ts
April 2026

Whether we specialize in repairs and restoration work or new construction, repairs are something that we all must do, at least from time to time. With ever-increasing competition from faster and cheaper building systems, the onus is on us as masonry profe