KOR-IT Helps Rebuild Chile

Words: Al ArreguinKOR-IT is heading to Santiago Chile to participate in the Expo to Rebuild Chile. As you may remember, Chile suffered a massive 9.0 earthquake with numerous aftershocks rivaling even the largest of quakes in USA.

The Chilean infrastructure was devastated, hundreds of people perished, and the Government of Chile has put the call out to the World to send experts who can assist with the rebuilding effort.

KOR-IT was recently announced as a guest speaker on Wednesday June 18th, 2010 and will be discussing how a core drill is used for destructive testing of concrete on highways, roads and bridges. KOR-IT executives will also be discussing their 50+ years of engineering experience, which has lead to the industry's best performing core drill bits and mounted core drill machines.

In the later half of the presentation, KOR-IT will discuss how new diamond chain saw and core drill technology has led to the Promethean Search and Rescue Line. This line of heavy-duty concrete cutting tools can be used to save lives in the event of another disaster like Chile's recent 9.0 earthquake. This gear can cut through concrete in seconds to locate survivors buried under fallen concrete and create a safe escape path, with which to rescue them.

Please visit our website, www.kor-it.com, for more information on this incredible event.
About: Tools
PPE That Workers Actually Wear: Building Buy-In Through Education and Smart Selection
August 2026

In masonry construction, personal protective equipment (PPE) is often the last line of defense between a worker and an injury. Yet despite its importance, PPE compliance remains one of the most common challenges on jobsites across the country. The realit

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh

Why "The Software Can't Track That" Is Finally Going Away
August 2026

For as long as specialty contractors have used field software, most of them have kept a workaround somewhere: a spreadsheet on a foreman's laptop, a whiteboard in the trailer, or a text thread where crew leads send block counts at the end of the day becau

Monadnock Building
August 2026

Chicago’s Monadnock Building doesn’t dominate the skyline the way it once did. Surrounded by steel-and-glass towers, the dark brick structure can seem almost understated. But for anyone in the masonry industry, it remains one of the most important buildin