Mortar Net Solutions adds EPDM Membrane to TotalFlash

Words: Art FoxMortar Net Solutions has added a new 45 mil Ethylene Propylene Diene Monomer (EPDM) membrane to its TotalFlash Masonry Cavity Wall Drainage Solution. The new EPDM membrane will be the standard TotalFlash membrane, but current TotalFlash membranes will be available on request.

EPDM is an easy-to-handle waterproof elastomeric synthetic rubber and has been used for decades as an extremely durable roofing membrane. It is highly resistant to punctures, ozone, ultraviolet radiation (UV), thermal shock and abrasion, and it will not turn brittle over time. It is flexible in low temperatures so TotalFlash panels and rolls featuring an EPDM membrane may be installed in a wide variety of temperatures.

It bonds aggressively with MPE-1 modified polyether sealant from Mortar Net Solutions so TotalFlash EPDM panels and rolls may easily be overlapped at their ends to form air and water-tight joints. The EPDM membrane and MPE-1 sealant are 100 percent compatible with the new CompleteFlash one-piece synthetic rubber and polypropylene blend 14-inch High Corner Boots and end dams from Mortar Net Solutions.

EPDM is one of the most proven materials commonly used to provide waterproofing. In addition to roofs and flashing, EPDM is found in pond liners, tunnels, foundations and green roofs. EPDM is one of the most sustainable and environmental materials used in the construction industry. Its extreme durability means low life cycle costs and it can be recycled into the manufacturing of other products.

For more information, visit www.mortarnet.com.
Beyond the Block: Aesthetic Innovations in CMU Construction
August 2026

Concrete masonry units (CMUs) have long been a mainstay of construction. They are well known as a “tried and true” material with a long history of high-strength structural performance, affordability, ease of assembly, and a long lifecycle. CMU constructio

The Most Overlooked Profit Center on Your Job Site
August 2026

The real cost of equipment ownership isn't what you pay on day one. It's what happens over the years that follow. The purchase price of a new mortar mixer, grout pump, material handling system, or masonry saw is only part of the investment. What happens

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic