Q&A: ANSI/NSC-373

Words: Dennis f BuechelThe Natural Stone Council’s executive director, Duke Pointer, discussed the sustainable production of the natural dimension stone standard.

Q: What does the ANSI/NSC-373 standard cover?
A: The basis for the standard was created from the industry’s Best Practices documents, as well as previous sustainable product assessment standards based on life-cycle thinking developed by NSF International, which helped create the document. The standard is applicable to quarries and processors of natural dimension stone and is divided into several areas, including energy, water, transportation, site management, land reclamation and adaptive use, management of excess process materials and waste, corporate governance, safer chemical and materials management and human health and safety. The standard also allows for innovation, which supports continuous improvement of quarries and processors who are in pursuit of sustainability certification.

Q: How is certification achieved?
A: There are 18 different requirements under the ANSI/NSC-373 standard and they have a total of 41 points, encompassing a total of four levels of certification — bronze, silver, gold or platinum. When achieving any of the certification levels, a company can use that certification to differentiate itself from its competition. The more points a company earns on an ongoing basis, on the way to the maximum of 41, the higher the level designation. For instance, managing water recycling and energy usage better will earn more points.

Certification is on a facility site-specific basis. That means each operating quarry or fabrication plant must have its own certification. There is an annual review for compliance, but the certification itself lasts three years, and then the facility must be recertified in the fourth year. Because ANSI/NSC-373 was developed as an ANSI Standard, so it can be applied internationally with a third-party certifier like NSF International, which works around the world.

Q: What is the ANSI/NSC-373 certification process?
A: It’s a two-step process for quarries and fabricators. First, there is an offsite documentation review of information supporting the prerequisites and selected optional credits in the standards. Second, an onsite audit of the quarry, processing or fabrication facilities. Certification is granted once these steps are completed and the location meets the requirements of the standard.

Q: What are the approximate costs to complete certification?
A: NSF says the costs will be determined by a number of factors, including scope of operations. That would include the number of quarries or fabrications facilities that are to be certified and the level of certification that the company is pursuing. NSF can provide a quote based on this information and help determine how to proceed.

Q: Will certification provide a competitive edge in the marketplace?
A: Across the building products spectrum, many architectural and design firms, owners and contractors, understand the importance of sustainability standards and specify products that are certified. In the broader sense, certification will definitely provide a competitive edge when competing for green building projects.
PPE That Workers Actually Wear: Building Buy-In Through Education and Smart Selection
August 2026

In masonry construction, personal protective equipment (PPE) is often the last line of defense between a worker and an injury. Yet despite its importance, PPE compliance remains one of the most common challenges on jobsites across the country. The realit

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh

Why "The Software Can't Track That" Is Finally Going Away
August 2026

For as long as specialty contractors have used field software, most of them have kept a workaround somewhere: a spreadsheet on a foreman's laptop, a whiteboard in the trailer, or a text thread where crew leads send block counts at the end of the day becau

Monadnock Building
August 2026

Chicago’s Monadnock Building doesn’t dominate the skyline the way it once did. Surrounded by steel-and-glass towers, the dark brick structure can seem almost understated. But for anyone in the masonry industry, it remains one of the most important buildin