SOLA T PRO MAGNETIC TORPEDO SPIRIT LEVEL

Words and Photos: KESON/SOLA

AURORA, Illinois, October 11, 2022: At just 9 inches (23 cm) and featuring a magnetic base and V-groove on the upper measuring surface, the new T PRO torpedo spirit level from SOLA is suitable for a wide range of measuring tasks. Thanks to its three vials, the T PRO allows you to carry out measurements horizontally, vertically, and even at a 45° angle and all with a measuring tolerance of 0.001 in./in. (± 1 mm/m). The extra-large vial recesses ensure maximum readability. The robust aluminum frame combined with extra strong and durable plastic (ABS) guarantees a long service life at a low weight.

Compact Size

The key characteristic of the T PRO torpedo spirit level is it’s compact, conical design. The combination of a strong aluminum body with a tough plastic cover ensures maximum stability and durability, even under the harshest site conditions. At just 9 inches (23 cm) in length, the T PRO is the perfect tool for measuring in tight spaces and it fits perfectly into any toolbox or your pockets.

Three Vials for a Range of Applications

The T PRO is equipped with three break-resistant acrylic ring vials for horizontal, vertical, and 45° measurements. The vials each feature four rings, making them ideal for showing or checking inclines. The distance between the rings corresponds to an inclination of 2% during horizontal measuring. The extra-large recesses and the viewing window in the frame allow you to comfortably read the vials from all angles. The vials are built into the profile for optimum protection.

Magnetic Surface and V-Groove

Thanks to a magnetic strip with high adhesive strength fitted to the lower measuring surface, the T PRO allows you to work comfortably and with both hands on metal surfaces. The magnetic strip is recessed to ensure precise measurement results with a measuring tolerance of 0.001 in./in. (±1 mm/m). The upper measuring surface has an integrated V-groove to hold it in place securely on pipes, when constructing scaffolding for example.

Chairman’s Message: When Things Don’t Go as Planned
June 2026

Not every day in this business goes the way we planned. Some days, everything lines up. The crew is moving well. Materials are on time. The job is flowing the way you hoped it would. And then there are the other days. The ones where something breaks. T

Fechino Files: Trust Your Subs, Just Document!
June 2026

When I was working for a large masonry contractor, we typically performed masonry work with our own employees. When we would construct large Segmental Retaining Walls, often we would require a subcontractor who had larger equipment for different portions

Marvelous Masonry: Borobudur
June 2026

For masonry contractors and suppliers, few structures offer as much practical insight as Borobudur. Built in the 9th century in Central Java, this massive stone monument remains as one of the most advanced examples of large-scale masonry construction ever

Wrapping Up Our Year And A Look Ahead
June 2026

It is amazing another year has gone by and what a year it has been. We have seen a lot of progress on so many fronts. All of this happens specifically due to the support of our members. Your support this past year is positioning our industry to make huge