Masonry Testing Protocols

Words: Bronzella Cleveland

MCAA Magazine

Jerry Painter 

Subject: Masonry Testing Protocols HAPPY NEW YEAR!!! I hope everyone had a great 2017. I am believing that it will be a better than ever year for the masonry industry in 2018. As I began to think about starting a new year, I looked at it similar to starting a new building project. As you review the specifications for the materials you will submit for approval you see the section on quality assurance. If it is a small project you will probably take care of it with paper work in your submittal. But if the project is a large project, it will probably include onsite testing. Serious thought and planning should be put into the testing procedures to be used. Chapter 3 of the TMS 402 Code says that "Masonry design requirements in this Code are valid when the quality of the masonry construction meets or exceeds that described in the Specification." The designer will set up the QA (Quality Assurance) Program based on one of three requirement levels. The program will also describe the procedure for reporting and review as well as resolution of non-compliance. The QA Program will also state the qualifications of the testing laboratory and inspection provider. You will notice the last three sentences had mandatory language, such as “will” in them. This is not optional. If this is not provided, you should have this as part of your preconstruction conference. Planning inspections and testing should be carefully thought out and planned. These procedures will cost you in manpower hours which equates to money $$$. ALWAYS use a testing and inspection agency that is CERTIFIED for each test or inspection they are providing. There are many very good accredited and certified agencies across the country. Make sure the testing companies are experienced in Masonry. A flawed test or report will cost you a considerable amount of your time and money. A minimum requirement is provided by ASTM C1093 on qualifying laboratories In order to prepare for any discussion on testing, there are several Standards you should get to know up close and personal. If they are requiring prism testing to insure the strength of the masonry, then ASTM C1314 should be followed. When grout testing is part of the program, the ASTM C1019 is the “go-to” Standard and if your testing agency wants to use the cardboard testing boxes, then both of you should read the standard again. If field testing of mortar is in the QA Program, then ASTM C1586 Standard Guide for Quality Assurance of Mortars, is the must read document. Once you and the testing agency are able to pass a closed book written exam we can go forward. I believe in using ASTM C270 to design a mortar that meets the strength design required by the project specifications. You then use ASTM C780 Annex 4 to do a cement to aggregate ratio test in the field whenever required. The results of that test takes a couple of hours while the masons continue to work. I had a national laboratory do a mortar mix design for me several years ago. We provided all the material required and ask for a copy of the work sheet the day they prepared the test. Not only did they not supply the workup I had to call after 35 days to get the results. The results were unusable because the flow was out of the allowed tolerance. They said they would do the test again and did. But still I did not get the work sheet and got the results 30+ days later. Once again the flow rates were not right. They wasted 60+ days of my time and their money and lab time. Their money you ask? Yes, they sent me a bill for two design mixes and guess what? You are right - hell has not frozen over yet! As we welcome in the New Year, let's make sure we plan the year, our projects and our testing protocol correctly. If you have any questions about testing and inspection protocol, contact YOUR MCAA. And remember, "RAISE THE LINE AND COME ON AROUND THE CORNER".
About: Painter's Corner
I’m Still Riding Beside Him
October 2026

A couple of weeks ago, I found myself riding down the road in an 18-wheeler with my son. He recently got his CDL permit and is scheduled to attend a class, so he needs to get some driving time in. That day he was driving a Kenworth, and I was riding along

Just a Blast from the Past
October 2026

This weekend I had to go through and clean out a cabinet that I used to keep some of the old masonry information that I like to look at from time to time. I had the very first issue of Masonry Construction that was published in 1988. I know, forever ago.

Stockholm City Hall
October 2026

Stockholm City Hall is known around the world as the setting for the annual Nobel Prize banquet. But behind the ceremonies and the landmark tower is another story: a building constructed with approximately 8 million bricks. The massive red-brick complex

Geared Up for Fall Semester
October 2026

Along with finding potential leaders in the next generation of masonry professionals, getting to work with instructors in CTE programs throughout my region offers a great sense of hope and expectation. Add to that an environment where new technologies an