MCAA Gateway

Words: Dan Kamys

Congratulations to Vincenzo Capasso  - Pullman Ermator S26 HEPA Dust Extractor Winner

The Mason Contractors Association of America (MCAA) congratulates Vincenzo Capasso of Capasso Restoration in North Haven, Conn.  Vincenzo is the winner of a S26 HEPA Dust Extractor, donated by Pullman Ermator.

Unlike low cost homeowner vacuums, Ermator HEPA Dust Extractors are equipped with tested and certified HEPA filters that trap the smallest, most dangerous-to-breath dust particles and prevents them from being released in the air. A HEPA Dust Extractor not only exhausts perfectly clean air, it is far more efficient for the fast recovery of bulk dry dust, debris and other building materials found on every construction, abatement and restoration job site. They can also be connected to electrical power tools to extract the freshly cut and friable concrete dust, considered to be the most hazardous to construction workers.

The Pullman Ermator S26 HEPA Dust Extractor was raffled at the 2017 World of Concrete show in Las Vegas.  All visitors who spun the MCAA prize wheel or completed a form at the MCAA booth or MCAA tent in the Gold Lot were entered to win.

To learn more about the S26 HEPA Dust Extractor and Pullman Ermator’s full line of dust extractors, visit www.ermatorusa.com.

The MCAA would like to thank Pullman Ermator for their generous donation and support of the masonry industry

.

About: Tools
Beyond the Block: Aesthetic Innovations in CMU Construction
August 2026

Concrete masonry units (CMUs) have long been a mainstay of construction. They are well known as a “tried and true” material with a long history of high-strength structural performance, affordability, ease of assembly, and a long lifecycle. CMU constructio

The Most Overlooked Profit Center on Your Job Site
August 2026

The real cost of equipment ownership isn't what you pay on day one. It's what happens over the years that follow. The purchase price of a new mortar mixer, grout pump, material handling system, or masonry saw is only part of the investment. What happens

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic