Henry Medical Center Facility Expansion

Words: Dan KamysSeptember 2008

REHAB & RESTORATION CASE STUDY: Color Blending Masonry

case1-2 Henry Medical Center opened it doors to Henry County, Ga., in 1979. In a rural county of only 35,000 residents the medical center was capable of serving the needs of the surrounding communities for several years. With the close proximity of Atlanta, growth was exponential for Henry County, expanding to more than 160,000 residents by the new millennium. Keeping up with the needs of the community meant expanding with a five-story tower expansion project to add an additional 202,000 square feet of enhanced medical space. The brick was matched as closely as possible to the available brick selection offered by today's brick manufacturers. Different colors and textures are common in multiple batches of brick, especially when an addition is constructed years later using brick from a different manufacturer. It is nearly impossible to match brick from different years, runs and even from geographical regions of production. case1-2 Masonry staining can help match the intricate color ranges often found in the surface of brick. The manufacturing processes often create a multiple pattern of color that can be re-created with brushes, rollers and sponges. A stain was specified on the hospital's new addition to try and get even closer to matching the older brick without masking any of the surface texture. Access was not interrupted to the hospital during the staining. All areas of the hospital were protected during the masonry cleaning and surface preparation the color treatment, and the clean up afterward. Pedestrian safety zones were created utilizing OSHA required warnings and barriers. Work had to be completed with as little interruption as possible. Low VOC content and a water-based stain allowed for an even further low-key application process.

About the product

case1-3Masonry stain has been developed as a dual-purpose product. It will add color to masonry and will repel water from significantly penetrating the vertical masonry surface. This is done with a one-step application process, which is described on the package label. Masonry stain protects masonry against deterioration caused by airborne chemicals, including acid rain, while allowing moisture vapors to escape. This helps to prevent promoting spalling and similar failures, due to moisture trapped in the vertical wall.

Environmental and safety concerns

NWRT-91 is environmentally friendly, water-based, non-flammable and complies with VOC and other appropriate government safety standards, legislation and regulatory requirements. Spatter or spills can be easily cleaned with water. News, tips and information about the <asonry industry case1-4

Application

  • Verify that walls, masonry, concrete, stucco, block (split faced/fluted) and mortar that have been treated with any form of chemical/acid wash are neutralized
  • Verify that masonry, concrete, stucco, block (split faced/fluted) and mortar units in existing building are structurally sound and fully intact
  • Before application, ascertain that the masonry walls have a neutral ph level
  • Alkali or efflorescence should be treated with proper neutralizing compounds as recommended by masonry supplier before application can begin.
  • Application of NWRT-91 is possible in temperatures of 30º F to 110º F; Masonry surfaces ideally should be dry before work begins.
NWRT-91 can be applied by two methods, either a labor-intensive process involving hand application, ensuring a precise application of color and artistry to each individual unit, or by spray application when complete coverage is desired. Nawkaw Water Repellent Treatment, (NWRT-91), is a water-based, color-penetrating water repellent in a hydrous, multiple-polymer formulation of resin solids, color pigments and specially formulated tint base to give a wide range of colors. It is designed to exhibit the overall characteristics of being light fast, UV resistant, penetrating, aspiratory, quick drying, and mold, fungus, mildew and water resistant. This product is for use on above-grade vertical masonry surfaces. case1-5

The results

Staining of the brick and mortar was completed in just three months and consisted of cleaning, light restoration work, and brick and mortar color application. A total of three crews were required, and Nawkaw provided everything from beginning to end to complete the building in time for a scheduled Grand Re-Opening Gala for the hospital. The groundbreaking took place in 2004, and work was completed nearly two years later. The new construction greatly enhanced the appearance of the facility, so much so that stain was later chosen as a viable solution to color match the concrete parking deck to the newly stained masonry expansion. For more information, visit www.nawkaw.com.

CASE STUDIES:

Flashing: TotalFlash in ActionMast Climbers: A New Nashville SkylineMortar: Rising to the ChallengeMast Climbers: Keeping the Faith
Return to Table of Contents
Holding History Together: The Art of Lateral Restraint in Masonry Restoration
January 2026

The first thing you notice about an old masonry building isn’t always its beauty. Sometimes it’s the bow in a wall or the way time and the elements have tugged at the mortar joints. Every century-old structure carries its story in cracks, tilts, bows, and

Stone Savvy: Helping Clients Choose Stone with Intent
January 2026

In today’s design environment, clients are surrounded by inspiration, endless images, samples, and styles that make choosing materials feel exciting and overwhelming all at once. Within that sea of options, stone carries weight. It defines first impressio

MASONRY STRONG Podcast, Episode 36 Recap: Kim Spahn, CEO of the Concrete Masonry Checkoff
January 2026

On this episode of the MASONRY STRONG Podcast, Justin got to sit down for a conversation with Kim Spahn to talk about the Concrete Masonry Checkoff, how Kim first got involved in this industry, and much more.

From Day One to Long-Term Success: Onboarding Strategies for Contractors
January 2026

The construction industry is facing one of its toughest challenges in decades. Companies are struggling to find enough skilled workers while competing to keep the ones they have. At the same time, projects are becoming more complex, deadlines are tighter,