83% of Construction Firms Can't Find Qualified Workers

Words: Dan Kamys

83% of Construction Firms Can't Find Qualified Workers

Most construction firms report they are having trouble finding qualified craft workers to fill key spots as the industry recovers from its years-long downturn, according to the results of an industry-wide survey released today by the Associated General Contractors of America. Association officials called for new career and technical school programs, as well as other workforce measures to offset the labor shortage.

“As the survey results make clear, many construction firms across the country are having a hard time filling available positions,” said Ken Simonson, chief economist for the Associated General Contractors. “Considering how much the nation’s educational focus has moved away from teaching students career and technical skills during the past few decades, it is easy to understand why the construction industry is facing such severe labor shortages.”

Eighty-three percent of responding firms nationwide are having a hard time filling craft worker positions – on site construction jobs including carpenters, equipment operators and laborers. Sixty-one percent are having a hard time filling professional positions – including project supervisors, estimators and engineers.

Simonson noted that worker shortages appear most severe in the Southeast, where 86 percent of contractors report having a hard time finding qualified workers. Eighty-four percent of contractors in the Midwest, 82 percent in the West and 67 percent in the Northeast report difficulty finding workers.

The construction economist added that many firms are changing the way they operate to address worker shortages. Forty-eight percent of firms nationally report increasing their use of subcontractors and 37 percent increased their using of staffing agencies. In addition, 59 percent of firms nationally report they have increased wages to help retain construction craft workers and 56 percent have done so to retain construction professionals.

Construction firms seem particularly concerned with the quantity and quality of local construction education and training programs. Nationwide, 55 percent of firms say the local pipeline for preparing new craft workers is below average or poor. Meanwhile, 35 percent of firms have a low opinion of the local pipeline for construction professionals.

The association crafted Preparing the Next Generation of Skilled Construction Workers: A Workforce Development Plan for the 21st Century in response to the growing worker shortages, Simonson noted. The plan identifies steps, like increasing funding for vocational education and making it easier to establish construction-focused schools, designed to reinvigorate the pipeline for new construction workers. “Schools like this should be the norm, not the exception,” the economist said during a visit to Portland, Oregon’s ACE Academy, a construction-focused public high school.

Simonson noted that over 1,000 construction firms participated in the survey, which was conducted during August and September of this year. Click here to see the national survey results, analysis of the data and regional and state-by-state results.

Beyond the Block: Aesthetic Innovations in CMU Construction
August 2026

Concrete masonry units (CMUs) have long been a mainstay of construction. They are well known as a “tried and true” material with a long history of high-strength structural performance, affordability, ease of assembly, and a long lifecycle. CMU constructio

The Most Overlooked Profit Center on Your Job Site
August 2026

The real cost of equipment ownership isn't what you pay on day one. It's what happens over the years that follow. The purchase price of a new mortar mixer, grout pump, material handling system, or masonry saw is only part of the investment. What happens

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic