May 2014 Table of Contents

Words: Dan KamysTable of Contents

FEATURES

Flashing and Drainage Flashing, something you can see little of on a completed building, can be the difference in how a project turns out.

Minimizing Dust on the Job Power equipment manufacturers are working to help mason contractors meet OSHA requirements for silica dust elimination. Codes and Standards The Masonry Advisory Council provides a history lesson on how codes and standards are used in the masonry industry.
masonry and construction information

COLUMNS & DEPARTMENTS

From The Editor Chairman’s Message Government Affairs New Products Business Building Full Contact PM Classified Advertising News

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together