ASTM: Testing Surface Infiltration Rate of Permeable Unit Paving Systems

Words: Dan KamysASTM: Testing Surface Infiltration Rate of Permeable Unit Paving Systems

The ASTM International recently released C1781 Standard Test Method for Surface Infiltration Rate of Permeable Unit Pavement Systems. This test method is specifically designed for assessing the surface infiltration rate of new and in-service permeable interlocking concrete pavements and permeable clay brick pavements. The test method involves timing a slow pour of a known weight of water into a 12 inch diameter pipe fastened to the permeable pavement surface with plumber’s putty. The infiltration rate is easily calculated using a formula in the test method. The test method also provides guidance on how to locate the 12 in. diameter pipe on the unit paving surface to measure infiltration that represents the pattern on the larger pavement area. The test uses similar equipment and methods in ASTM C1701 Standard Test Method for Infiltration Rate of in Place Pervious Concrete. The similarities between C1701 and C1781 make the test results comparable.

“We are seeing more provincial, state and local permeable pavement specifications require surface infiltration tests to accept new permeable pavements and to evaluate their in-service infiltration for determining surface cleaning,” says Craig Walloch, chair of ASTM Subcommittee C15.04 on Research who helped develop the standard. “Now they have a method with specific guidance for testing unit paving with results that can be compared to that from pervious concrete and porous asphalt.” Walloch further noted that existing guidelines published by stormwater agencies have used C1701 to test surface infiltration of permeable unit paving. While the results from that test method applied to permeable unit pavement are useful, C1781 provides clear guidance on executing the test on these pavements.

To purchase and download C1781 from ASTM, visit www.astm.org/Standards/C1781.htm. The standard retails for $42 and ASTM members receive a 10% discount. For further information on permeable interlocking concrete pavement design, construction and maintenance visit the Interlocking Concrete Pavement Institute at www.icpi.org.
Stop Juggling: The Best Way to Master Your Masonry Job Sites
January 2026

You’re in the business of building structures that will stand for generations. Yet, too often, the process of managing the job site feels built on quicksand. Every construction project manager knows the feeling: the constant, fra

Brick Jointers: Purpose, Patterns, & Practical Applications
January 2026

After leads have been built and bricks have been laid, it’s crucial to tool the joints before the mortar sets. The tool of choice for this task is a brick jointer, but it can be tricky to decide which one to use. This guide will walk through the purpose o

Laying It Straight: Line-Holding Accessories for Masons Who Demand Precision
January 2026

When it comes to laying brick, block, or stone, nothing replaces a good line. A tight, true mason’s line is the backbone of straight courses and clean elevations, and the hardware holding that line is every bit as critical. Bon Tool’s lineup of Line & Lin

The Importance of Eye Protection in Masonry
January 2026

There are few stereotypes more iconic than the image of a construction worker wearing a hard hat and safety glasses. Protective glasses are among the most common items worn by workers in the masonry field, second only to the hard hat. According to OSHA, w