Spider Provides Suspended Scaffolding, Fall Protection and Training for Penterra Plaza, Denver

Words: Dan KamysSpider Provides Suspended Scaffolding, Fall Protection and Training for Penterra Plaza, Denver

Spider, a division of SafeWorks LLC, provides a complete suspended access solution to general contractor Reconstruction Experts Inc. for inspection and repair work on the Penterra Plaza in Denver.

This 280-foot-tall, multi-terraced commercial and residential building required inspection of every weep hole and brick tuck pointing location of the exterior fa??ade; leak and pressure tests on every window fitting; and corrective glazing work on failed windows.

More than 750 linear feet of SpiderRail, Spider’s new temporary guardrail system, was used to provide OSHA-compliant fall protection along the edges of the building. Seven modular platforms ranging in length from 20 to 35 feet and powered by Zmac hoists, 20 davits, and custom engineered davit adapters provided access for the contractors to complete their inspection and repair work to the windows and fa??ade. Finally, a 170T hydraulic crane was used to load the equipment onto the building.

Spider was involved in all of the safety planning for this project and provided Competent Person Training for all of the mason workers, glaziers and general contractors utilizing the equipment.

“As a first time customer of Spider, I have nothing but positive things to say about the equipment and service they are providing for the Penterra Plaza project,” says Jake Marshall, project manager with Reconstruction Experts Inc. “Whenever we are faced with challenges, Spider’s Denver team personally takes action and delivers a safe and timely solution. We are especially impressed with their plan to utilize a crane service to load the equipment onto the structure, since transporting it through the building would have been disruptive to the building’s occupants. Not only did this improve our efficiency, it reassured the building owners that their concerns were our top priority.”

Spider was the only local swing stage company that could provide the high volume of rental equipment, custom fabrication and engineering, and extensive training required for Penterra Plaza. After more than 100 days into the project, there have been no incidents or injuries.

Masonry in the Media: Fenway Park, Trim Castle, & More
February 2026

The settings of films influence the atmosphere of a scene and immerse the viewers in their movie-going experience. From Parisienne train stations to Boston baseball parks, these four masonry-made structures set the scene in the films they were featured in

Outreach Outlook: Celebrating CTE Month and the Madness of Masonry
February 2026

As we settle into February, the masonry industry turns its focus to a celebration that lies at the very heart of our mission: National Career and Technical Education (CTE) Month. For the Outreach & Education Division, this isn't just a date on the calen

Stop Juggling: The Best Way to Master Your Masonry Job Sites
January 2026

You’re in the business of building structures that will stand for generations. Yet, too often, the process of managing the job site feels built on quicksand. Every construction project manager knows the feeling: the constant, fra

Laying It Straight: Line-Holding Accessories for Masons Who Demand Precision
January 2026

When it comes to laying brick, block, or stone, nothing replaces a good line. A tight, true mason’s line is the backbone of straight courses and clean elevations, and the hardware holding that line is every bit as critical. Bon Tool’s lineup of Line & Lin