Fremont Tactical Training Facility

Words: Dan Kamys

Case Study: Block

Photography by WLC Architects Inc.

“This building is tested to the limits and needed to be constructed with materials able to live up to such high demands. Concrete block masonry is such a material.” – Bill Louie, Architect, WLC Architects Inc.

In November 2002 Fremont, Calif., voters approved Measure R (Fire Safety Bond) with 74.4 percent of the vote. The Measure authorized the issuance of $51 million in General Obligation Bonds to provide funding to replace three fire stations with new modern stations; build a public safety training center; and make remodeling and seismic improvements to seven existing fire stations.

One of the most recently completed projects is a state-of-the-art tactical training center located on a two-acre site off Stevenson Boulevard, in a commercial area west of Interstate Highway 880. The Fremont Tactical Training Center (FTTC) is designed for hands-on training and includes a 32-person classroom and a five-story training tower.

Case Study: Block

Facility background The tower structure has five separate and distinct building sections to simulate anticipated emergency responses city-wide. These sections include a one-story, single family dwelling; a two-story concrete building; a six-story tower; interior and exterior stairwells; and a two-story, garden-style apartment. Training components within the tower include a live-burn room; sloped- and flat-roof ventilation props; self-contained breathing apparatus (SCBA) maze rooms; repelling; a fire sprinkler prop and an artificial smoke prop. Horizontal search-and-rescue props are designed as part of the site improvements. Included is an open-trench prop, complete with simulated busted pipes, side wall cave-in feature and damming capabilities to simulate a flooded situation. In addition, a completely underground, confined space prop with varying diameter pipes and turns is included.

Fremont fire Capt. Gerry Fogel says the department wants firefighters to train for blazes at multi-level structures, since many multi-level apartment buildings and condominium complexes exist in Fremont.

Case Study: Block

The need As a tactical training center, the building is climbed on, rapelled from, lit on fire, blasted with water, and filled with smoke. It needed to be constructed with materials able to withstand the extreme stressed put upon it. Concrete masonry was determined to be such a material. According to Bill Louie, project architect for Folsom, Calif.-based WLC Architects Inc., this unique project was perfectly suited to feature masonry construction.

“This building is tested to the limits and needed to be constructed with materials able to live up to such high demands,” Louie says. “Concrete block masonry is self-contained and fire resistant, which is imperative for a project like this. It is durable, easy to maintain, cost effective and versatile.”

Case Study: Block

CMU to the rescue Constructing a building meant to endure these brutal exposures – over and over, throughout the life of the building – required an extraordinarily strong, durable construction material. For this reason, concrete masonry units (CMU) were used for all exterior, as well as interior walls. The masonry was left exposed, since facing materials could not stand up to the rigors of the exposure. This made construction fast and easy, and helped to keep costs down.

An integral water repellent additive was used in the concrete masonry mix during manufacture, to reduce water absorption by capillary action, and also to reduce the possibility of efflorescence deposits. This was particularly important as the walls are frequently inundated with water at high pressures during the training exercises. Equally important is the use of a compatible integral water repellent in mortar that not only provides the same water repellency to the mortar, but also includes a bond-enhancing admixture to ensure a strong, water-tight bond with the masonry units.

The Fremont Community Emergency Response Team (CERT) and the Fremont Fire Explorers also will train at the site. The final cost for constructing the training center was just more than $4 million. Fogel says it was completed under budget. The center replaces a 47-year-old training tower and is expected to last well into the future.

The FTTC project’s structural engineer was R.M. Byrd and Associates Inc., Ontario, Can.; the general contractor was Diede Construction Inc., Woodbridge, Calif.; the mason contractor was Gentry Masonry Corp., Santa Rosa, Calif.; and the masonry producer was Basalite, Tracy, Calif.
This article is courtesy of the National Concrete Masonry Association.
The Behind-the-Wall Secrets Every Mason Already Knows (But Some Ignore)
March 2026

You’ve been around long enough to know this already: stone doesn’t fail on the face; it fails behind the wall. You can lay the prettiest veneer in the county, but if the prep is junk, that wall’s gonna start telling on you after a couple of winters. Manu

From the Mound to the Mortar: Jon Rauch’s Tall Order in the Masonry Industry
March 2026

In the record books of Major League Baseball, Jon Rauch is a literal giant. At 6 feet, 11 inches, he remains the tallest player to ever step onto a Big League mound. But today, the Olympic Gold Medalist and 11-season MLB veteran isn’t looking for a strike

Case Study: The Scoop
March 2026

Leading UK architecture firm, Corstorphine & Wright, has announced the completion of ‘The Scoop’, a unique concave office building in Southwark, London. The innovative design reuses an existing building and integrates a conical cut-out façade in white gla

Executing Color-Driven Designs Without Compromising Craftsmanship
March 2026

On today’s jobsites, masonry contractors are being asked to do more than install manufactured stone veneer (MSV). They’re being asked to interpret design trends and execute them with precision. Homeowners arrive with curated Pinterest boards. Designers r