AEMP Elects New Officials

Words: Dan Kamys AEMP Elects New Officials


The Association of Equipment Management Professionals (AEMP) has elected the 2011/2012 Executive Committee Members to its Board of Directors. Each year, AEMP members select top peers from various organizations to lead the board, as well as the organization’s new president/CEO who also serves as board chairman.

Dave Gorski, CEM, equipment manager for K5 Construction, Chicago, was elected president/CEO and chairman of the board. Gorski will serve through March 2012. Gorski’s main goals for the upcoming year are building on the organization’s strategic initiatives, including two of the most recent, AEMP University and Green Fleet Certification.

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh