Lafarge???s Rock Quarry and Aggregate Lab

Words: Dan Kamys

Quarry Tour

Recently, I toured Lafarge’s Cumming, Ga., 500-acre rock quarry and Aggregate Lab. Plant Manager David Stewart delivered a world-class view of the quarry, which has been in operation since the 1970s, to me and Masonry Advertising Director Marvin Diamond. A state-of-the-art Aggregate Lab is the home of endless testing of materials and products. The many functions of the quarry and lab truly are fascinating.

Each time an area of the quarry is chemically blasted, 30 to 50 tons of rock are produced. Oversized pieces are broken apart with a hydraulic hammer. Rock is dumped into a box with a vibrating plate, and then enters a jaw crusher. It is reduced to seven-inch pieces and then sent up a conveyor belt to begin the separation process. More than 10 sizes will eventually be sorted. The rocks are washed and sold to companies as aggregate, sand or other materials. A total of five companies are actually located at the quarry. Private citizens can buy aggregate and boulders for landscaping as well.

Some acreage of the Lafarge quarry property has been reserved for wild life in partnership with the National Wildlife Federation.

Also, located at the quarry is an Aggregate Lab and business office. Testing of Lafarge products takes place at the lab as well as testing for other agencies, state departments, etc. The lab also is the site of cutting-edge research and development, conducted by a team that includes a resident geologist. Materials are cured onsite and tested to check PSI standards, etc.

The adherence to safety rules and regulations leaves a strong impression on quarry visitors, as does the cleanliness of the lab and even the quarry. Lafarge runs a tight ship to produce its highly regarded products. Take a look through the images from the visit to learn more from our visit.

??
??

From Day One to Long-Term Success: Onboarding Strategies for Contractors
January 2026

The construction industry is facing one of its toughest challenges in decades. Companies are struggling to find enough skilled workers while competing to keep the ones they have. At the same time, projects are becoming more complex, deadlines are tighter,

Finding the Right PPE for Your Work
January 2026

When it comes to PPE, one thing’s for sure: safety isn’t one size fits all. The work you’re doing, where you’re doing it, and even what time of year it is, can all make a big difference in what gear actually works. Price, comfort, and job performance all

Back Injuries: The Real Cost and How to Prevent Them
January 2026

The mention of back injuries makes mason contractors cringe, and for good reason. Masons lift heavy objects every day, all day long. When a person sustains a back injury, it is serious. It affects every part of their life, from their ability to perform wo

Detailing for Durability: The 2026 Guide to High-Performance Stone Veneer Transitions
January 2026

Some of the most expensive failures involving manufactured stone veneer installations don’t come from the stone at all, but rather from the material transitions and flashing around it. Transitions are weak points in the overall cladding where water can fi