Kaman Industrial Names Clayton to Head Energy, Power Management Programs

Words: Dan Kamys

Kaman Industrial Names Clayton to Head Energy, Power Management Programs

Kaman Industrial Technologies Corp. named Theodore (Ted) M. Clayton as marketing manager, energy and power management services. He will oversee the company’s sales and marketing functions in the dynamic energy management field, implementing programs that will deliver long-term savings to customers by driving higher levels of efficiencies. Clayton brings more than 20 years of experience in engineered and applied product sales and marketing with an emphasis on value-based solutions.

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

PPE That Workers Actually Wear: Building Buy-In Through Education and Smart Selection
August 2026

In masonry construction, personal protective equipment (PPE) is often the last line of defense between a worker and an injury. Yet despite its importance, PPE compliance remains one of the most common challenges on jobsites across the country. The realit

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh