Concrete Trash to Cash

Words: Dan Kamys Concrete Trash to Cash Multiquip Supplies Tanner Excavating with EZ Grout Hog Crusher that transforms?Įleftover concrete to profit.

Pat Tanner, owner of Tanner Excavating, encountered a dilemma when removing excessive concrete waste from his company’s jobsites. Tanner was charged $10 per yard of construction trash at the local land fill, in addition to the cost of transporting the debris from the site to the landfill. Upon realizing that this was not a cost-effective way to run a business, he began transporting the debris to his farm, where he had plans to eventually dispose of it. In less than 12 months, the excessive concrete waste on Tanner’s property had grown from a small pile to a mound measuring about 200 feet long X 25 feet wide X 10 feet tall.

Fixing the problem After researching various solutions, Tanner read online about Multiquip’s EZ Grout Hog Crusher. Multiquip quickly arranged for a demonstration at Tanner’s farm through its local dealer, Michigan CAT. With the assistance of a mini-excavator, the EZ Grout Hog Crusher was able to compress large slabs and chunks of concrete into a useable grade of fill. Within two hours, Tanner had about 12,000 pounds of useable fill he could sell.

“In Michigan, you are not permitted to create a dump site or landfill on your property; however, storing for rescaling is allowed,” says Tanner. “As an owner of the EZ Grout Hog Crusher, I am in compliance with all of the disposal laws. I have literally turned my trash into cash, contributing to our company’s bottom line.”

The result The EZ Grout Hog Crusher Job Site Material Recycler was capable of pulverizing recyclable material in minutes, thus eliminating the need to have debris removed from Tanner’s various construction jobsites. It also was capable of handling materials of differing sizes, and varying strengths of concrete.

The Hog Crusher provided a cost-effective, reliable and durable product that helped excavators perform their jobs faster and easier. It also has saved tens of thousands of dollars annually to Tanner Excavating from expensive disposal costs.
For more information, visit www.multiquip.com.??
Side Stories:
About: Case Study
Gables Republic Square & Hotel ZaZa
September 2026

Gables Republic Square / Hotel ZaZa is a 24-story mixed-use boutique hotel and urban residential tower with street-level retail located on a 0.75-acre site in downtown Austin. Camarata Masonry Systems, Ltd. (CMS) was responsible for the supply and instal

The Science of a Straight Line: Why Masonry’s Smallest Decisions Make the Biggest Differences
September 2026

There is a unique phenomenon in construction: the human eye can spot an out-of-plumb wall from 50 yards away across a crowded job site. We might not always be able to explain the exact mathematical deviation without a laser level, but our brains instantly

The Utah Masonry Council's Masonry Education Day
September 2026

The 2026 Masonry Education Day at Interstate Brick in West Jordan is bringing together members of Utah’s architecture, engineering, and construction community for a day focused on education, technical understanding, and workforce development. The event r

MCAA Upstate New York: Regaining Market Share Through Education
September 2026

The Upstate New York chapter of the MCAA was established in 2014 by a dedicated group of both union and non-union masonry contractors, producers, and suppliers who shared concerns about the declining use of masonry. T