November 2009: Full Contact Project Management

Words: Dan KamysNovember 2009 alt Full Contact Project Management
Masonry Magazine alt project management alt

Have It Your Way

<>So, you came up with a great idea that would save you a bunch of money or time on your project, and now you’re wondering what you can do with it. Is that about right? You figure if you ask your client about making this change, he’s going to ask you for some kind of a credit. What do you do? Maybe you should just implement the change, say nothing, and hope that he doesn’t notice. Here’s the best way to make this happen. First off, we have to consider some reality: Your client believes that if you are the one who wants to make changes, then it is probably in your best interest, not his. So you need to help him see things the same way you do. He needs to believe that he is getting as much out of your request as you are. Here’s an example. We had a paving project with multiple locations. The contract documents called for specific, large machinery to be used in the paving process. Now, this would have been OK if we had been able to pave the entire project all at once, but it wasn’t practical for this application. The best thing for the project and us was to complete a piece of it, get it covered up, protect it, and then work on other pieces of the project. But the specs were clear. What to do? I wrote an RFI and advised the client that he had two choices: He could have the area paved now and placed under his control, ahead of schedule; or, he could wait, leave the area exposed to the elements, and pave it later, per the schedule. Well, my client was presented with two options, both of them appearing to be about equal in cost to him, but just one of which gave him a finished product sooner. All he had to do in order to get this was just “OK” a small change to the specs. He’d get something he wanted for it, so he agreed to the request.
alt
Coach Gary says:

“Make it easy for your client to see things your way!”

What did I get? I was able to sell an entire part of the project – fence it off and not have to touch it again. Complete! It is amazing how often a client will be more supportive of you if he feels included in some of the decision-making. On the other hand, try making those decisions yourself, doing all of the layout, and then seeking approval of what you did on your own. Too often, there are criticisms of the choices you made in his absence. In other words, he doesn’t have any “skin in the game.” See the difference? This year and next, as we are all trying to work our way through some difficult times, let’s maximize our opportunities. On any project, the mantra ought to be, “Get in, get out and get the money.” The longer you stay on a project, all things being equal, the less profit you will make. Do everything you can to keep the client on your side, particularly when it doesn’t cost any money. Get done, and get the money. Make your client an “honorary” member of your team. A little involvement can go a long way. And, sometimes, clients actually have good ideas.
Coach Gary's Corner:

Preserve your profits and your job! Get free reports you need for your own business. Go to www.FullContactTeam.com, and click on the link near the top of the page. The reports are free; but not knowing the info is expensive! The best athletes and their teams use coaches. Do you have a coach to take you to the next level? How about a process that’s simple but extremely effective? Masonry readers get this report for free. Check out the other updates and info that will help your projects. Also, you can get Coach Gary’s book, “Get Paid for a Change,” and his new CD, “How to Become the Leader Your Team Needs.”

Return to Table of Contents
OSHA’s Top 10 Violations of the Year

In the construction and general industry fields, there are quite a number of dangers within the various work environments. This, of course, makes perfect sense when you consider the number of variables one must deal with daily. It is only logical when you

About: Featured
Lightweight Concrete Masonry Block: Building Efficient Buildings Efficiently

In the construction industry, masonry is a labor-intensive trade. Each day, masons handle thousands of concrete masonry unit (CMU) that form a building’s structure. Because normal weight (NWT) CMU weigh about 50 pounds (lbs), repetitive lifting can strain

About: Featured
Cultural Heritage Meets Modern Architectural Design: The Alain Ducasse Restaurant, AlUla

For Craft Group’s Alain Ducasse restaurant project in AlUla, we fostered a collaborative effort between the design team and local craftsmen and ensured that the masonry work reflected the area's cultural heritage while meeting modern construction standard

MASONRY STRONG Podcast, Episode 12 Recap: Paul Cantarella Jr., President at Cantarella & Son, Inc.

On this episode of the MASONRY STRONG Podcast, Paul Cantarella Jr. joins the show to talk about his career and passion for the masonry industry, how his journey started, the building of his family's company, and his life outside of work as well. Childhoo

About: Featured