Quick response codes

Words: Dan Kamys/Public/News/20111019134000-1.jpg" width="600" height="338" border="0" alt="Vista Americana QR Code" />
Vista Americana QR Code
Crossville Inc.’s Q2R allows specifiers selecting tile products to create personal portfolios of favorite products right on an iPhone, Android or other smart phone. Using the “Quick to Request, Quick to Respond” app to scan Quick Response (QR) codes on all Crossville sample chips will immediately produce product details. Samples can be requested in real time, and links to products can be shared through social networks. When a Q2R account is created, an online portfolio can be visited anytime for easy viewing of product lists.

Crossville Q2R was created as part of the company’s Sustainable Samples program. This approach to tile product sampling lets contractors, architects, designers, builders (all specifiers) use the smart phone app to get the information they need immediately and quickly, and to request only the samples they really want.

Crossville’s Sustainable Samples kit, which contains realistic “tile” samples made of recycled and recyclable cardstock, has been created using advanced, high-resolution imaging technology to capture a near-exact visual of each tile. This earth-friendly chip kit contains every tile, every color in Crossville’s Porcelain Stone collection in a compact, lightweight kit that is about 10 X 10 X 4 inches.

The back of each “tile” has a QR code that specifiers can scan with their smart phones to retrieve more information about the product. When they have made their selections, that same smart phone app will enable them to automatically order a real product sample, just by clicking on one button. It’s the sustainable way to make samples attainable.

For more information, visit www.crossvilleinc.com.
Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh