Quick response codes

Words: Dan Kamys/Public/News/20111019134000-1.jpg" width="600" height="338" border="0" alt="Vista Americana QR Code" />
Vista Americana QR Code
Crossville Inc.’s Q2R allows specifiers selecting tile products to create personal portfolios of favorite products right on an iPhone, Android or other smart phone. Using the “Quick to Request, Quick to Respond” app to scan Quick Response (QR) codes on all Crossville sample chips will immediately produce product details. Samples can be requested in real time, and links to products can be shared through social networks. When a Q2R account is created, an online portfolio can be visited anytime for easy viewing of product lists.

Crossville Q2R was created as part of the company’s Sustainable Samples program. This approach to tile product sampling lets contractors, architects, designers, builders (all specifiers) use the smart phone app to get the information they need immediately and quickly, and to request only the samples they really want.

Crossville’s Sustainable Samples kit, which contains realistic “tile” samples made of recycled and recyclable cardstock, has been created using advanced, high-resolution imaging technology to capture a near-exact visual of each tile. This earth-friendly chip kit contains every tile, every color in Crossville’s Porcelain Stone collection in a compact, lightweight kit that is about 10 X 10 X 4 inches.

The back of each “tile” has a QR code that specifiers can scan with their smart phones to retrieve more information about the product. When they have made their selections, that same smart phone app will enable them to automatically order a real product sample, just by clicking on one button. It’s the sustainable way to make samples attainable.

For more information, visit www.crossvilleinc.com.
Beyond the Block: Aesthetic Innovations in CMU Construction
August 2026

Concrete masonry units (CMUs) have long been a mainstay of construction. They are well known as a “tried and true” material with a long history of high-strength structural performance, affordability, ease of assembly, and a long lifecycle. CMU constructio

The Most Overlooked Profit Center on Your Job Site
August 2026

The real cost of equipment ownership isn't what you pay on day one. It's what happens over the years that follow. The purchase price of a new mortar mixer, grout pump, material handling system, or masonry saw is only part of the investment. What happens

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic