From the Editor: Acronyms: What PM Means to Me

Words: Dan Kamys

Editor Karen HickeyKaren Hickey, editor

To make comments or suggestions, send e-mail to karen@lionhrtpub.com.

Acronyms are ever-present in our daily lives. Readers of this magazine will be familiar with OSHA, EPA, and associations like ABAA, USGBC and AIA, to name only a few. Having just taken the helm as editor of Masonry Design and this being my first issue, I am thankful I already know what CMU, BIM-M and AEC mean. This got me thinking about the letters PM. While this abbreviation usually means post meridiem — the afternoon and evening of each day — it could also stand for project management or preventive maintenance. Let’s explore these two meanings.

As an editor, I’m essentially a project manager. My sales reps and I take blank pages and gather interesting editorial content and advertisements in each issue of the magazine. I’ve always said that putting a magazine together is like building a puzzle: eventually the pieces all come together. Likewise, with construction projects, all the pieces come together in time. A good project manager sees to it, though I know it’s much more involved than a jigsaw puzzle.

What about preventive maintenance? One might say that preventive maintenance is an essential element of project management, in the sense that if you’re managing the project correctly, you’ll avoid a lot of problems. Good project management would therefore naturally end up being preventive maintenance.

These days, technology plays an extensive role in both project management and preventive maintenance for the AEC environment. This issue of Masonry Design explores some of that technology, including BIM and various software programs that can help prevent problems and finish the project.

At the end of April I attended the AIA Conference in Orlando. There I saw firsthand the excitement surrounding BIM, virtual reality and other technologies for the built world. If you have a masonry building in which technology has played a role in the design/build process, tell me about it at karen@lionhrtpub.com. I’d love to cover more of this technology and these projects in the coming issues.

From Bikes to Buildings: Part 2
September 2025

As rainscreen wall designs become increasingly prevalent in today’s construction environment, there have been questions regarding their design. How wide should the capillary break be? How do we create this capillary break? Can the same methods be used i

Vibing Masonry #8: CMU’s Durability and Maintenance Value
September 2025

Heading to Spokane, WA, I found myself riding the airport tram at O’Hare in Chicago. Looking out the window at a part of the 26-year-old International Terminal 5, I spotted a painted structural steel beam in front of a concrete masonry unit (CMU) wall. Th

Keeping it Clean: Lifecycle Maintenance for Manufactured Stone Veneer
September 2025

One of the many benefits of manufactured stone veneer is that it’s a robust, durable product that requires little maintenance over the course of its life span. In fact, its irregularity in shape and color helps hide minor dirt and dust. But like any build

MCAA's Wall Evaluator: The Future of Masonry Training and Assessment
September 2025

MCAA Wall Evaluator, Masonry Training, Masonry Assessment, 3D Scanner, AR Glasses, Digital Twin, Digital Mesh, Point Cloud, Infrared VCSEL, Vocational Technology, EdTech, Standardized Assessment, Objective Evaluation, Data-Driven Feedback, Portable Traini