Painter's Corner: Tolerance of a CMU Wall

Words: Dan Kamys

Question:  What is the tolerance of a CMU wall?  How far out of plumb can a CMU wall be and still be within code?

As everyone should be aware the “code” in question is the “Building Code Requirements and Specification for Masonry Structures” (aka, TMS 402/602). The answer to the question is found in TMS 602: Specification Article 3.3F titled “Site Tolerances”, which gives several construction tolerances.

But before we answer the question regarding plumb walls, we need to go back to Specification Article 1.6C commentary.  This is important enough that we will quote it. “Tolerances listed in Specification Article 3.3F were established to assure structural performance and were not based on aesthetic criteria.”

What this means is that any tolerances given will allow the wall to perform as designed.  Some of these tolerances given may not look pleasing to the architect or owner. They are not meant to! They are for structural performance. 

Now, to answer the question regarding plumb. Article 3.3F.2.b states that we have +/- ¼ inch in 10’-0”, 3/8 inch in 20 feet, and ½ inch maximum tolerance. The symbol +/- means plus or minus not plus and minus. Any wall height beyond 20 feet has a maximum of ½ inch deviation out of plumb. 

Please understand there are other publications that list construction tolerances. A couple of these are BIA Tech Notes 11C and D and NCMA Tek Note 03-8A. Unless they are specifically referenced, they are only guidelines. Also note, there are tolerances listed in the Canadian Masonry Standards.

One thing you must absolutely read are the project specifications.  All projects should have specifications that will follow the layout of a published set of specifications, such as MasterSpec, or they (designers) can write their own. This is where you must read with your very best comprehension.  An architect/engineer (A/E) can design/specify tolerances more stringent than TMS 602. If they do, and the tolerances the A/E specify cannot be met for whatever reason, you MUST notify the A/E immediately.  Notification after the work is complete could mean the wall comes down at your expense.

Currently there is no ASTM Standard that include construction tolerances. There is a proposed Standard on Masonry Workmanship that has been worked on for well over 20 years. One of the major stumbling blocks are tolerances. A single set of tolerances has gotten nowhere. Multi-level tolerances have also been discussed. The general belief is that a specifier will select the highest (precision) level every time while specifying the lowest grade of unit masonry. So, a discussion on tolerances for visual aesthetics will haves to happen another day.

Remember, read your project specifications and understand what they are saying. Just because it is in writing doesn’t make it workable. When in doubt ask questions.

If you have questions regarding a Code or Standard issue send it to MCAA.

Raise the line and come on around the corner!

Staying Ahead of the Curve: Practicing Financial Discipline Before a Downturn Hits
June 2025

In the masonry business, when the phones are ringing off the hook and jobs are lined up back-to-back, it's easy to get lulled into a sense of security. But seasoned contractors know that the good times don’t last forever. Markets tighten, projects stall,

Achieving Precision: How Top Masonry Crews Deliver Consistent Openings
June 2025

Let’s be honest—if you’ve spent any time in the field as a mason, you’ve probably had at least one “memorable” encounter with a wood buck that didn’t quite go as planned. Picture this: It’s a hot Tuesday afternoon, you’re racing weather, and someone—no o

Commercial vs. Residential Projects: Which Is Right For You
June 2025

As masonry contractors, we all face plenty of challenges - from the cost of maintaining safety standards to dealing with workforce issues. But one question has stayed constant throughout my 30+ years in the industry: Which is better - commercial or reside

Only a Few Rooms Left at the Waterfront Collection: Register for Midyear Now!
June 2025

CLICK HERE TO LEARN MORE AND REGISTER FOR THE 75TH ANNIVERSARY MIDYEAR If you’re thinking about attending the MCAA’s 2025 Midyear Meeting on Mackinac Island, now is the time to act. Due to the demand, our original room block at the host hotel, The Grand,