Completed Operations Liability

Anyone engaged in construction, repair, installation, alteration and maintenance can ill afford not to have protection against completed operations exposure.

By HARRY F. BROOKS, CPCU, CLU claims can occur weeks, months or even years after the project is finished. The devastating potential for such losses can be demonstrated best by citing several cases involving losses. Assistant Dean, Miami Miami University, Oxford, Ohio.

REMISES and operations liability coverage of most contractors excludes liability arising out of an accident involving operations the contractor has completed or abandoned. This situation is best illustrated by a contractor who finished a job, removed all equipment and departed from the jobsite. Sometime later, some part of the construction project caused injury to several members of the public. It may have been the result of improper installation, defective workmanship, or similar problems arising out of the completed project. Premises and operations liability insurance usually doesn't cover such incidents.

Contractors often question why such losses are excluded from their premises and operations liability insurance coverage. To include it in all such liability insurance would increase the cost significantly for everyone. This occurs because some types of businesses, including some types of construction work, have a larger exposure with respect to liability arising out of completed operations, while others have a negligible exposure.

This variance in exposure makes the exclusion of coverage from the premises and operations liability insurance a much more equitable process by allowing those with the exposure to purchase the coverage separately and pay its cost, while those with a negligible exposure are not charged for coverage not necessarily needed.

Unfortunately, contractors and, occasionally, their insurance representatives don't understand how serious this potential exposure can be. This is because their attention is directed toward purchasing adequate liability insurance to cover accidents during the performance of construction work. With the completion of the construction project, little thought is given to the possibility that completed work can cause serious injury and damage to members of the public, and such.

CUT ESTIMATING TIME

ER TO 50%

The ProE professional project estimator is fast, easy to use and accurate. ProE can increase your business profitability.
✔ Bid on more projects in less time with greater accuracy increasing your bid to contract ratio.
✔ Alternates and corrections can be calculated in minutes.
ProE is designed by mason contractors exclusively for masonry projects. It works the way you work in preparing an estimate. Easy to use, You can be running projects almost immediately. The proven choice of professionals.

"I had no computer experience, but in 1-1/2 weeks I could do it all" Kyle Lochonic, Jones and Simpson, Inc. "...it's easy to keep track of jobs and costs...ProE cut our estmating time in half." Bill Anderson. The Summary is great, being able to flip things around to see where you markups really are. ProE is phonemenal! Shayne Jackson, J & S Masonry Anderson Masonry.

CALL FOR MORE INFORMATION: (517) 694-8981
PROFESSIONAL
PROE™
Project Estimator
2190 Delhi NE, Box 220
Holt Michigan, 48842
WELCOME
DEALER INQUIRIES
MASONRY-MAY/JUNE, 1993 23


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next