Masonry Magazine November 2002 Page. 24
Cover Story
Area using a wood tool/stick to remove clumps of mortar. Then wipe wall with course rag such as burlap, carpet, etc. Shake rag often to clean. Do not use acid, abrasive powders or unauthorized cleaners.
End of Work Period
At the end of each day or at the start of each shutdown period, cover weather-exposed walls. Use non-staining, waterproof material and extend it by at least two feet over each side of the wall. Anchor securely.
Protect finished walls by covering with 15 pound felt paper and erect wooden barriers to protect walls from construction traffic or material movement.
Protect glazed face from exposure to things such as welding slag, harmful chemicals and sharp or falling objects.
Final Cleandown
(When mortar has cured)
Use only clean running water.
Wash down wall from top to bottom using water
Nationwide
Parts
BRACING
SYSTEMS INC.
CONTRACTORS EQUIPMENT
Authorized Lull
Parts
Distributor
Wide Selection
of Hard-to-Find
Parts at
Competitive
Prices!
LULL
LULL
UPS & Fed Ex
for Quick Delivery!
BRACING SYSTEMS, INC.
888-259-4740
Ask for Dane or Jim-
or Fax Orders - 630.665.4034
-Parts Dept.
Elgin Butler-House of Syrian (section of inset plecel
Elgin Butler House of Syrian (section of inset piece
The
Engineered Wood
Specialists!
For
Industrial
Applications...
Scaffold
Plank
• MasterPlank
• TecLam
• Microllam
Concrete
Forming
Building
& More!
CAUSEY LUMBER CO.
Roseville, Michigan 800.365.9663
Fax 586.294.1505 www.mccauseylumber.com
www.masonryshowcase.com