Masonry Magazine January 2005 Page. 61

Masonry Magazine January 2005 Page. 61

Masonry Magazine January 2005 Page. 61
Cement Intensities in Construction

PCA has incorporated an upward adjustment in cement intensities for most nonresidential and some public construction sectors. Cement intensities measure the amount of cement used per level of construction spending. The increase in cement intensities is based on an improvement in the competitive conditions of concrete, which has not run up as much in price, relative to steel.

Cement Shortage Assessment Update

Tight cement supply conditions now prevail in portions of 35 states, however, not all portions of each state are characterized by tight supplies. The methodology used in the PCA shortage map tends to exaggerate the national shortage assessment.

MITA Fastest Trowel & Skills Challenge

On Saturday, October 30th, Orco lock held its annual Fastest Trowel Competition. Several journeymen showed up at 6:30 a.m. to begin the tournament to see who's the Fastest Trowel! This year's winners are:

Oscar Bojorguez
NuWay Inc.
Mauricio Avendano
NuWay Inc.
Marcos Silva
Superior Masonry

Also, held on the same day was the Skills Challenge Competition, comprised of union and non-union apprentices from around the state. This year, 16 competed, and the winners are:

1st Year
Mark Ferriera
Willams & Sons Masonry

2nd Year
Martin Lopez
K&S Masonry

3rd Year
Ryan Thomas
D.B.M. Hatch

Thank you to all the participants this year. The winners will go on to compete at the Masonry Showcase in Chicago on April 21. Everyone is encouraged to attend this great event! For more information on the Masonry Industry Training Association, please call (800) 995-4540.

the ultimate
masonry scaffold
CRANKUP
SCAFFOLDING

EZ Complete Package for
105' Length x 29.5' Height
$21,999.00

EZ
Heaviest Construction
5 Board Laborer Platform
7000 lb, Capacity

XL Complete Package for
105' Length x 24" Height
$19,999.00

XL
6'2" Base Width
5 Board Laborer Platform
Many Transport Options

MT Complete Package for
105' Length x 21' Height
$18,999.00

MIGHTY
Removable Mason
and Laborer Tenders
Easy to Maneuver
Most Versatile System

NS Complete Package for
105' Length x 27' Height
$19,999.00

NS
6' Base Width
5 Board Laborer Platform
2 Speed Winch

• Full Factory Warranty
•Powder Coat Painting of all models
• Increase Mason Production by 30%

CrankUp Scaffolding, LLC.
1633 Blairs Bridge Road
Atlanta, GA 30122
Ph: 770-944-7400
Fax: 770-944-7188
(800) 896-9464
Check out our website@
www.crankupscaffolding.com


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next