2014 Construction Put In Place to End Strongly

Words: Dan Kamys

2014 Construction Put In Place to End Strongly

Total Construction Put In Place (CPIP) for 2014 will be $62 billion greater than last year — a 7 percent increase according to the latest report from FMI. CPIP should finish this year around $972 billion and is expected to top $1.04 trillion in 2015, Commercial and manufacturing construction are two of the largest growth sectors, accounting for more than $111 billion in new construction.

Randy Giggard, managing director of research services for FMI says, “With new and apparently sustainable sources of natural gas and shale oil, America is on the verge of a veritable manufacturing renaissance building petrochemical plants in the Gulf and gaining interest from more companies, especially foreign-owned companies, considering relocating manufacturing to America.”

Lodging has experienced the largest percentage increase for CPIP in 2014. It is expected to finish the year 24 percent up from 2013, building on last year’s 25 percent increase. This sector now accounts for nearly $17 billion in CPIP.

To download a copy of the current Construction Outlook, click here. To receive the report on a quarterly basis, email outlook@fminet.com. Contact Sarah Avallone for reprint permission at 919.785.9221 or savallone@fminet.com.

Is Contact with Wet Mortar or Grout Dangerous?
April 2026

In the world of masonry, few materials are as common as mortar and grout. Whether you are laying brick, concrete masonry units (CMU), or pouring grout into masonry walls, wet cement and mortar are constant companions. However, beneath their utility lies a

The Importance of Instructor Support
April 2026

Whether you are a new or veteran masonry instructor, we all need support throughout our careers. We can never stop learning, and keeping up with ever-changing technology, materials, and installation techniques can be overwhelming alongside the everyday pr

Vibing Masonry #11: Innovative Concrete Masonry Technologies in Healthcare Design
April 2026

In the high-stakes environment of healthcare design, every material choice is a clinical decision. Architects, engineers, and facility administrators are tasked with creating spaces that are not only resilient and code-compliant but also conducive to heal

Why Termination Bars Still Matter: A Practical Look at Long‑Term Flashing Performance
April 2026

In recent discussions across the masonry industry, I have heard termination bars described as “old school.” The implication is that with modern materials, primerless peel-and-stick flashings, advanced sealants, and structural insulated sheathing, mechanic