Custom Swingstages for Landmark Building in Downtown Seattle

Words: Dan Kamys

>>> Case Study: Rehabs and Restorations

Spider, a division of SafeWorks, is providing a custom suspended access solution to contractor Elite Construction for masonry restoration work on The Josephinum apartment building in Downtown Seattle. The 14-story residential landmark posed a unique access challenge. Its cornice was four feet wide and 12 feet below the top of the parapet, making it impossible to safely and stably get standard rental equipment close enough to access the building’s fa??ade.
alt alt
In one week’s time, Spider designed and produced a solution that consisted of two 30-foot offset platforms powered by SC1500 traction hoists and equipped with a modified counterweight beam to increase stability and a custom head on the walk-through stirrup. This allowed the entire platform to be on the inside of the suspension rope and provide complete access to the wall and underside of the cornice. Rigging was accomplished by gantry outriggers on the roof. “I’ve been a customer of Spider for thirty-three years,” says Don Watson, foreman with Elite Construction. “I was confident they could solve the unique access challenges the Josephium building presented, and they have once again exceeded my expectations. I’ve partnered with John Zemlin, Spider’s district sales representative in Seattle, for over 20 years. “He, along with their experienced team of engineers, delivered an ideal solution where competitors fell short,” Watson continues. “Spider has enabled our crew to work safely and comfortably.” For more information, visit www.spiderstaging.com. Return to Table of Contents
Chairman’s Message: When Things Don’t Go as Planned
June 2026

Not every day in this business goes the way we planned. Some days, everything lines up. The crew is moving well. Materials are on time. The job is flowing the way you hoped it would. And then there are the other days. The ones where something breaks. T

Fechino Files: Trust Your Subs, Just Document!
June 2026

When I was working for a large masonry contractor, we typically performed masonry work with our own employees. When we would construct large Segmental Retaining Walls, often we would require a subcontractor who had larger equipment for different portions

Marvelous Masonry: Borobudur
June 2026

For masonry contractors and suppliers, few structures offer as much practical insight as Borobudur. Built in the 9th century in Central Java, this massive stone monument remains as one of the most advanced examples of large-scale masonry construction ever

Wrapping Up Our Year And A Look Ahead
June 2026

It is amazing another year has gone by and what a year it has been. We have seen a lot of progress on so many fronts. All of this happens specifically due to the support of our members. Your support this past year is positioning our industry to make huge